PLM06-03030
| Sprinkler (Final) | 9/7/2006 | 9/7/2006 | 9/7/2006 3:40:07 PM | P | PASS |
|
|
pablo; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PLM06-03021
| Sprinkler (Final) | 9/7/2006 | 9/7/2006 | 9/7/2006 3:19:36 PM | P | PASS |
|
|
###-#### jeff
|
PLM06-03017
| Plumbing Rough-in | 9/6/2006 | 9/7/2006 | 9/7/2006 3:07:35 PM | P | PASS |
|
|
Minor changes in water and drain lines so unable to pressure test. Requesting a flow test on the drainage and a working pressure test on the water.; Phone #: ###-#### Internet Inspection Request from: Penny Smith
|
PLM06-03018
| Plumbing Rough-in | 9/6/2006 | 9/7/2006 | 9/7/2006 2:27:27 PM | P | PASS |
|
|
bob - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
PLM06-03032
| Final | 9/7/2006 | 9/7/2006 | 9/7/2006 1:58:19 PM | P | FAIL |
|
|
###-#### fred
|
PLM06-03033
| Final | 9/7/2006 | 9/7/2006 | 9/7/2006 1:57:55 PM | P | FAIL |
|
|
###-#### fred
|
PLM06-02859
| Sprinkler (Final) | 9/6/2006 | 9/7/2006 | 9/7/2006 1:17:22 PM | P | PASS |
|
|
lincoln; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
PLM06-02989
| Plumbing Rough-in | 9/7/2006 | 9/7/2006 | 9/7/2006 11:54:06 AM | A | PASS |
|
|
Rough-in will be ready around 10:30 am. Thank you.; Phone #: ###-#### Internet Inspection Request from: Jeff Miranda
|
PLM06-01817
| Groundwork | 9/6/2006 | 9/7/2006 | 9/7/2006 7:55:14 AM | A | CANC |
|
|
Please call Larry with any questions ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel Inspection cancelled from web by: Sonja Hankel
|