Inspections for the day of: Friday, September 7, 2007.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-01452 BLD-Aging Inspection9/7/20079/7/20079/14/2007 7:49:48 AM NR
The boise fire dept is working out an upgrade agreement with the owner.
FIR07-00449 FIR-Aging Inspection9/7/20079/7/20079/14/2007 7:47:01 AM NR
work is in progress
FIR05-00536 INSP-Final Inspection9/6/20079/7/20079/7/2007 5:02:57 PMAFAIL
The east system of the second floor is ready to final.
FIR07-00598 INSP-Final Inspection9/6/20079/7/20079/7/2007 4:59:07 PMAPASS
Permit finaled
BLD06-01069 FIRE-Conference9/7/20079/7/20079/7/2007 4:55:51 PMPCANC
Phone #: ###-#### Internet Inspection Request from: Dale Shuart
FIR07-00596 INSP-Sprinkler Rough-in9/6/20079/7/20079/7/2007 4:52:01 PMAPASS
The overhead piping except for the office marked on the approved plans is ok to cover.
FIR07-00722 INSP-Sprinkler Rough-in/Hydro9/6/20079/7/20079/7/2007 4:48:01 PMPFAIL
The rough-in of the piping as installed is ok. As-built plans will be required due to the additional sprinkler heads added. No "ok" to cover was given due to the owners may decide to utilize a anti-freeze system instead of tenting the piping. As of today the piping in the unheated areas has not been tented.
FIR07-00746 INSP-Sprinkler Rough-in/Hydro9/7/20079/7/20079/7/2007 4:44:04 PMPPASS
Sprinkler piping is ok to cover.
BLD05-00633 FIRE-Final Inspection9/6/20079/7/20079/7/2007 4:42:49 PMACANC
Need the project related fire alarm and fire sprinkler permits finaled first.
FIR07-00338 INSP-Sprinkler Rough-in9/6/20079/7/20079/7/2007 11:56:07 AMAPASS
Some tenting modification was required but is now ok to cover
FIR07-00340 INSP-Sprinkler Rough-in9/6/20079/7/20079/7/2007 10:33:09 AMAPASS
Some tenting modification was required but is now ok to cover
BLD07-01969 FIRE-Final Inspection9/7/20079/7/20079/7/2007 10:18:28 AMAPASS
life safety passed
BLD07-00427 FIRE-Final Inspection9/6/20079/7/20079/7/2007 9:38:11 AMAPASS
Life safety passed. Contractor had a signed letter from dave hanniman for the fire hydrant relocation.
BLD07-00948 FIRE-Final Inspection9/6/20079/7/20079/7/2007 8:29:22 AMAFAIL
This was an inspection for the egress corridor near the bakery. I need verification that this corridor has emergency lighting. I also noticed overspaced pendants in the bakery that need addressed prior to a final.