ELE10-01931
| Electrical Rough-In | 9/7/2010 | 9/7/2010 | 9/7/2010 3:10:48 PM | P | PASS |
|
|
paul Phone #: ###-#### ri ok
|
ELE10-01949
| Rough-In Permanent Service | 9/7/2010 | 9/7/2010 | 9/7/2010 2:47:02 PM | P | PASS |
|
|
Tom Phone #: ###-#### ri ok, p/s o/h rec ok
|
ELE10-01731
| Electrical Rough-In | 9/7/2010 | 9/7/2010 | 9/7/2010 1:29:17 PM | P | PASS |
|
|
Please see our Wireman Luke at ###-####. He is ready for a Ceiling inspection. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate ok cover ceilings
|
ELE10-01950
| Electrical Rough-In | 9/7/2010 | 9/7/2010 | 9/7/2010 12:27:43 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Rohl called, ri ok
|
ELE10-01725
| Final | 9/6/2010 | 9/7/2010 | 9/7/2010 10:07:47 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by John VanZandt ok final
|
ELE10-01471
| Final | 9/2/2010 | 9/7/2010 | 9/7/2010 9:34:49 AM | A | PASS |
|
|
Final on tool at Mask Phone #: ###-#### >> Inspection requested via web by Ken Heller saw tool and labels, ok to final, no card
|
ELE10-01269
| Final | 9/3/2010 | 9/7/2010 | 9/7/2010 8:36:04 AM | A | FAIL |
|
|
Jason Phone #: ###-#### >> Inspection requested via web by Rick Beckman called contractor, left correction notice, BCC 4-05-33(A),(B) all equipment shall be listed by a nationally recognized testing lab, NEC 110.3(A),(B) equipment shall be suitable for use and installed per listing instructions, NOTE: corrections shall be made within 10 working days or further action will be taken such as removal of power
|