FIR10-00225
| INSP-Final Inspection | 9/7/2010 | 9/7/2010 | 9/7/2010 2:43:31 PM | P | FAIL |
|
|
Rob and I went over the map requirements.
|
FIR10-00013
| INSP-Final Inspection | 9/7/2010 | 9/7/2010 | 9/7/2010 2:43:08 PM | P | FAIL |
|
|
Rob and I went over the map requirements.
|
BLD10-02029
| FIRE-Final Inspection | 9/7/2010 | 9/7/2010 | 9/7/2010 2:38:51 PM | P | FAIL |
|
|
Provide a sprinkler study of the existing fire sprinkler system to verify that it will adequate coverage for the intended storage arrangement and height as stated on the permit application.
|
MIS10-00226
| FIR-Final | 9/7/2010 | 9/7/2010 | 9/7/2010 2:29:02 PM | P | FAIL |
|
|
The partial height wall was rebuilt at 36" instead of the required 42"
|
BLD10-01385
| FIRE-Final Inspection | 9/7/2010 | 9/7/2010 | 9/7/2010 12:50:57 PM | P | PASS |
|
|
Life safety passed. Deficiencies such as incorrect door hardware and duct smoke detector testing will be addressed with the tenant improvement permit.
|
FIR10-00238
| INSP-Final Inspection | 9/3/2010 | 9/7/2010 | 9/7/2010 10:13:46 AM | A | FAIL |
|
|
The previous wall/draft stop/ needs to be removed out in the warehouse area and Storage Room 115 sprinkler pendants are too far down from the deck but still installed 8" above the t-bar/ceiling. Also in this room the flex ducting is creating alot of obstructions to the sprinkler coverage.
|