GCE11-00067
| GCE-Final | 9/6/2011 | 9/7/2011 | 9/7/2011 3:29:21 PM | A | PART |
|
|
Terry @ ###-####.Final pending installation of low voltage lighting and manufactures instructions for low voltage lighting. Load side circuit is 18-2 bell wire.
|
GCE11-00061
| GCE-Final | 9/6/2011 | 9/7/2011 | 9/7/2011 2:20:27 PM | A | NR |
|
|
Hank @ ###-####2 PM Inspection. Won't be ready till 9-8-11 afternoon.
|
ELE11-02060
| Electrical Rough-In | 9/6/2011 | 9/7/2011 | 9/7/2011 12:47:06 PM | P | PASS |
|
|
Walls in new offices. Phone #: ###-#### >> Inspection requested via web by Todd Sellman. Walls only.
|
ELE11-01629
| Final | 9/7/2011 | 9/7/2011 | 9/7/2011 12:24:57 PM | P | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by Darryn Coburn. Called in too soon.
|
GCE11-00106
| GCE-Final | 9/6/2011 | 9/7/2011 | 9/7/2011 9:58:24 AM | A | PASS |
|
|
Brian @ ###-####
|
GCE11-00106
| GCE-Rough-In | 9/7/2011 | 9/7/2011 | 9/7/2011 9:58:08 AM | A | PASS |
|
|
Brian @ ###-####. Heat pump.
|
GCE11-00107
| GCE-Final | 9/6/2011 | 9/7/2011 | 9/7/2011 9:44:07 AM | A | PASS |
|
|
Brian @ ###-####
|
GCE11-00107
| GCE-Rough-In | 9/7/2011 | 9/7/2011 | 9/7/2011 9:43:47 AM | A | PASS |
|
|
Brian @ ###-####. Heat Pump.
|