Inspections for the day of: Wednesday, September 7, 2011.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS11-00127 MIS-Aging Inspection9/7/20119/7/20119/9/2011 12:59:56 PM PASS
BLD11-01151 BLD-Final9/7/20119/7/20119/7/2011 4:45:27 PMPPART
Todd Phone #: ###-#### ok for temp occ need to check front door after its installed
BLD11-00125 BLD-Framing/Rough-in9/7/20119/7/20119/7/2011 4:44:29 PMPPART
scott please look at celing and the old bathroom and office area Phone #: ###-#### needs to fire block furred out wall and add metal stapes to ceiling
BLD11-01569 BLD-Final9/6/20119/7/20119/7/2011 3:16:43 PMPPASS
Doug Karnow Phone #: ###-####
BLD11-01828 BLD-Energy code compliance9/7/20119/7/20119/7/2011 2:55:11 PMPPASS
JIM - PLEASE CALL BEFORE GOING OUT Phone #: ###-####
BLD11-00913 BLD-Energy code compliance9/6/20119/7/20119/7/2011 2:53:32 PMAPASS
Bryan Phone #: ###-#### talked with Bryan told him it was ok to cover after fire ok for cover
GCB11-00073 GCB-Fndatn/slab ins/fld vent9/6/20119/7/20119/7/2011 2:50:54 PMAPART
Dave @ ###-#### trebar in walls marked setback ok
ESC11-00479 Site Final9/7/20119/7/20119/7/2011 2:49:46 PMPPASS
BLD10-01853 DOC - Permit Finaled9/7/20119/7/20119/7/2011 2:49:26 PMPPASS
BLD11-01624 BLD-Final9/6/20119/7/20119/7/2011 2:48:58 PMPPART
BOB-PLease call at least 30 mins prior to inspection Phone #: ###-#### ok to final after elec finals
ESC11-00524 Random Inspection9/7/20119/7/20119/7/2011 1:35:59 PMPPASS
BLD11-01764 BLD-Footing9/7/20119/7/20119/7/2011 1:34:23 PMPPASS
Chris Phone #: ###-####
GCB11-00043 GCB-Framing9/6/20119/7/20119/7/2011 10:35:00 AMAPART
###-####Call in advance ok to cover second section of awning
BLD11-01518 BLD-Energy code compliance9/6/20119/7/20119/7/2011 10:25:22 AMAPASS
KEVIN Phone #: ###-####
BLD11-02010 BLD-Foundation9/6/20119/7/20119/7/2011 10:10:59 AMAPART
around 10.00 am stem walls ok to pour columns not dug