FIR11-00422
| INSP-Sprinkler Rough-in | 9/7/2011 | 9/7/2011 | 9/7/2011 3:35:05 PM | P | PASS |
|
|
Rough-in spection passed. Piping can be covered
|
BLD11-00781
| FIRE-Final Inspection | 9/6/2011 | 9/7/2011 | 9/7/2011 3:34:05 PM | P | FAIL |
|
|
Project is not ready for a final inspection due to the project related fire alarm permit. Per Ron Amandus, it is ok for Winco to begin moving in the items that are to be stored in this warehouse. No finals will be given until the fire alarm and all related life safety items have passed inspection.
|
BLD11-01683
| FIRE-Final Inspection | 9/2/2011 | 9/7/2011 | 9/7/2011 3:28:14 PM | A | FAIL |
|
|
This project is not ready for a final inspection. Neither the project related fire alarm or fire sprinkler permits are ready for final.
|
FIR11-00430
| INSP-Final Inspection | 9/7/2011 | 9/7/2011 | 9/7/2011 3:26:23 PM | P | FAIL |
|
|
The gas to the hvac unit has not been turned on so the smoke detector could not be tested.
|
BLD11-01539
| FIRE-Final Inspection | 9/6/2011 | 9/7/2011 | 9/7/2011 2:59:12 PM | P | PASS |
|
|
Life safety passed.
|
FIR11-00386
| INSP-Final Inspection | 9/7/2011 | 9/7/2011 | 9/7/2011 2:58:55 PM | P | PASS |
|
|
Permit finaled
|
FIR11-00370
| INSP-Final Inspection | 9/6/2011 | 9/7/2011 | 9/7/2011 2:58:36 PM | P | PASS |
|
|
Permit finaled. The previous corrections listed have been completed.
|
FIR11-00419
| INSP-Alarm Testing | 9/6/2011 | 9/7/2011 | 9/7/2011 10:12:37 AM | A | FAIL |
|
|
No testing was performed. The duct smoke detector is mounted incorrectly and will need to be relocated to the narrow side of the duct prior to testing. The hood suppression system was not tested due to the hood suppression contractor not being on site.
|
FIR11-00386
| INSP-Final Inspection | 9/6/2011 | 9/7/2011 | 9/7/2011 9:13:46 AM | A | FAIL |
|
|
No access to the fire alarm panel. No inspection was performed.
|