Inspections for the day of: Wednesday, September 7, 2011.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-02444 ELE-Aging Inspection9/7/20119/7/20119/7/2011 4:21:34 PM PASS
still under construction
ESC10-00823 Site Final9/7/20119/7/20119/7/2011 4:07:27 PMPPASS
site clean, over 70 % vegetation final ok
ELE11-02041 Rough-In Permanent Service9/7/20119/7/20119/7/2011 3:14:45 PMPPASS
THANKS, BILL Phone #: ###-#### >> Inspection requested via web by Bob Glenn rough-in ok cover p/s u/g n ok
ELE11-02008 Rough-In Permanent Service9/7/20119/7/20119/7/2011 2:55:18 PMPPASS
THANKS, BILL Phone #: ###-#### >> Inspection requested via web by Bob Glenn rough-in p/s u/g n ok thanks for making corrections
ELE11-01637 Final9/7/20119/7/20119/7/2011 2:21:26 PMPNR
Partial Underslab inspection. Panel feeders. Contact Bob Thomas at ###-#### >> Inspection requested via web by Dan Hardisty
ELE11-01637 Electrical Rough-In9/7/20119/7/20119/7/2011 2:21:07 PMPPASS
rough-in ok cover trench, service feeders 3-4 in conduits
ESC11-00478 Random Inspection9/7/20119/7/20119/7/2011 1:51:59 PMPPASS
job site clean, ok
ELE11-02035 Electrical Rough-In9/7/20119/7/20119/7/2011 1:36:53 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Tyler Bowen rough-in ok cover walls
ELE11-02067 Rough-In Permanent Service9/7/20119/7/20119/7/2011 1:11:16 PMPPASS
larry Phone #: ###-#### p/s o/h rec ok
ELE11-02059 Permanent Service9/7/20119/7/20119/7/2011 12:55:03 PMPPASS
Kelly ###-#### p/s o/h rec ok
GCE11-00104 GCE-Final9/6/20119/7/20119/7/2011 12:21:39 PMAPASS
Julian-says that wasn''t really finaled-but is now really ready for final Phone #: ###-#### final ok Solar photovoltaic system
ELE11-01942 Electrical Rough-In9/6/20119/7/20119/7/2011 10:20:31 AMAPASS
bob Phone #: ###-#### rough-in ok cover conduits under slab, back patio
ELE11-02064 Electrical Rough-In9/7/20119/7/20119/7/2011 9:59:36 AMPPASS
Please call Eric to gain entrance. Phone #: ###-#### >> Inspection requested via web by Eric Brown rough-in ok cover
ELE11-01963 Final9/6/20119/7/20119/7/2011 9:45:53 AMAFAIL
BOB-Please call at least 30 mins prior to inspection Phone #: ###-#### NEC 210.8(2) Garage shall have GFCI protection
ELE11-01388 Final9/6/20119/7/20119/7/2011 9:36:26 AMAPASS
Kenny Phone #: ###-#### final ok
ELE11-00409 Final9/6/20119/7/20119/7/2011 9:26:17 AMANH
Contact: Shane Korte Phone #: ###-#### >> Inspection requested via web by Deb Gooden
ELE11-01787 Final9/6/20119/7/20119/7/2011 9:03:14 AMAPASS
gene Phone #: ###-#### final ok back patio
ELE11-02035 Electrical Rough-In9/6/20119/7/20119/7/2011 8:44:46 AMAFAIL
Toby Phone #: ###-#### >> Inspection requested via web by Sean DeLacy NEC 300.4 Protection from physical damage. Shall maintain 1 1/4 from edge of framing member. Can not install MC cable along inside steel studs
ELE11-02052 Rough-In Permanent Service9/6/20119/7/20119/7/2011 7:43:28 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Alan Lusk rough-in p/s u/g n ok
ELE11-02040 Permanent Service9/6/20119/7/20119/6/2011 2:53:34 PMAPASS
Brian Phone #: ###-#### p/s u/g rec ok
ELE11-01930 Final9/6/20119/7/20119/6/2011 1:27:30 PMPCANC
We have completed our installation and would like a Final Inspection. Kyle is the electrician and can be reached at ###-####. Thank you Phone #: ###-#### >> Inspection requested via web by Clint Tate Phone #: ###-#### >> Inspection requested via web by Clint Tate