FIR12-00463
| INSP-Final Inspection | 9/7/2012 | 9/7/2012 | 9/10/2012 3:14:16 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00252
| INSP-Final Inspection | 9/6/2012 | 9/7/2012 | 9/7/2012 3:51:10 PM | P | CANC |
|
|
Jordan Phone #: ###-#### The fire alarm plans examiner contacted the fire alarm contractor to schedule the inspection but the inspection was never setup. No inspection performed.
|
FIR12-00373
| INSP-Final Inspection | 9/4/2012 | 9/7/2012 | 9/7/2012 3:45:08 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00247
| INSP-Sprinkler Rough-in | 9/6/2012 | 9/7/2012 | 9/7/2012 3:25:11 PM | A | PASS |
|
|
Underground hydro tests for BLD 5, 6 & 7 passed.
|
BLD12-02053
| FIRE-Final Inspection | 9/6/2012 | 9/7/2012 | 9/7/2012 2:28:50 PM | A | FAIL |
|
|
Repair the exit discharge light, repair and lower the emergency light near the main exit, repair the exit sign that exits to the egress corridor, provide annual inspection for the fire extinguisher, replace the painted upright sprinkler head and remove the pendant in the north corner of the tenant space and provide the panic hardware on the bakery side of the door that leads back into the arcade. The nuclear exit signs appear to have a stamp stating they are good until 2020. Sprinkler system annual inspection is current.
|
BLD12-01796
| FIRE-Final Inspection | 9/6/2012 | 9/7/2012 | 9/7/2012 1:06:50 PM | A | PASS |
|
|
Life safety passed
|
FIR12-00452
| INSP-Sprinkler Rough-in | 9/6/2012 | 9/7/2012 | 9/7/2012 12:48:23 PM | A | PASS |
|
|
Sprinkler piping is ok to cover.
|
FIR12-00451
| INSP-Sprinkler Rough-in/Hydro | 9/6/2012 | 9/7/2012 | 9/7/2012 11:23:58 AM | A | PASS |
|
|
The sprinkler piping clouded in red on the modified plans is ok to cover given todays date. I noted that the 4" main, as marked on the plans has additional elbows which may require another plan modification to verify hydraulic calculations.
|
FIR12-00441
| INSP-Sprinkler Rough-in | 9/6/2012 | 9/7/2012 | 9/7/2012 10:15:44 AM | A | PASS |
|
|
Underground supply line is ok to cover. Two additional elbows have been installed. The designer is to incorporate this into the overhead sprinkler system design.
|
BLD12-00923
| FIRE-Final Inspection | 9/6/2012 | 9/7/2012 | 9/7/2012 10:05:15 AM | A | PASS |
|
|
life safety passed
|
BLD12-01705
| FIRE-Final Inspection | 9/6/2012 | 9/7/2012 | 9/7/2012 8:49:29 AM | A | PASS |
|
|
life safety passed
|
FIR12-00409
| INSP-Final Inspection | 9/6/2012 | 9/7/2012 | 9/7/2012 8:04:08 AM | A | PASS |
|
|
permit finaled
|
FIR12-00463
| INSP-Final Inspection | 9/6/2012 | 9/7/2012 | 9/7/2012 12:00:00 AM | A | PASS |
|
|
Inspection passed. There was an existing AES panel installed by Alarmco. The technician called Mark S. with Alarmco and I spoke to him directly to get a verbal confirmation that the NETCON rating was at a 5. He also will be emailing me a scanned PDF of the written verification.
|