Inspections for the day of: Friday, September 7, 2012.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00059 General Inspection9/5/20129/7/20129/10/2012 9:54:00 PMAPASS
Project is mostly complete. Will be be appling a hydrolic seed, tach, mulch mixture on the small postions of disturded soil within the completed construction area.
ESC12-00755 General Inspection9/7/20129/7/20129/10/2012 2:46:19 PM CANC
Re scheduled to 09/11/2012
ESC11-00884 BMP Violation9/7/20129/7/20129/10/2012 9:13:17 AMPFAIL
Will be discussing with the RP this afternoon over all actions the city will be taking and all REQUIRED actions to keep compliant with the BMC 8-17. None of the issue at the itime of inspoecting have been taken care of. Will have a confrence with the RP this afternoon.
ESC12-00437 Aging Inspection9/7/20129/7/20129/7/2012 3:17:35 PM PASS
ESC12-00539 General Inspection9/7/20129/7/20129/7/2012 2:45:02 PM PASS
ESC12-00270 DOC - Permit Finaled9/7/20129/7/20129/7/2012 1:48:38 PMPPASS
ESC12-00508 General Inspection9/7/20129/7/20129/7/2012 1:48:12 PM PASS
ESC12-00689 General Inspection9/7/20129/7/20129/7/2012 1:47:26 PM FAIL
Message to RP and sub contractor who installed the the sediment control:
Re-install the sediment barrier per the industry standards.
ESC12-00732 General Inspection9/7/20129/7/20129/7/2012 1:20:38 PM PASS
ESC12-00434 Aging Inspection9/7/20129/7/20129/7/2012 1:16:01 PM PASS
ESC12-00424 Aging Inspection9/7/20129/7/20129/7/2012 11:28:57 AM DONE
Permit finaled. Project complete.
ESC12-00424 DOC - Permit Finaled9/7/20129/7/20129/7/2012 11:28:51 AMPPASS
ESC12-00900 Site Preparation9/7/20129/7/20129/7/2012 11:22:16 AM NR
ESC11-00884 BMP Violation9/7/20129/7/20129/7/2012 9:22:46 AMAFAIL
Per the discussion with the RP last week, the RP was informed that he must conduct daily clean up of sedimenty and material off of the hard surfaces. Replace the sediment barriers at the bottom of slope and install d.i. protection that is an approved method. At the last inspection conducted, the site was maitained in a manor of cleaning hard surfaces and the inlet protection at the drain below the project area was missed. Today the inspection showed how clean up is not occuring on a daily basis at the end of the day. The barriers are not replaced, and the method used for the inlet protection is an approved. All correction must be taken care of this morning. Or elevated enfornce will occur.