ELE10-01426
| ELE-Aging Inspection | 9/7/2016 | 9/7/2016 | 9/12/2016 7:46:14 AM | | CANC |
|
|
too busy
|
ELE16-02883
| Conference | 9/6/2016 | 9/7/2016 | 9/7/2016 1:12:38 PM | P | DONE |
|
|
Tyler Phone #: ###-#### Discussed code layout on kitchen countertop. Also informed owner that he will be required to obtain plumbing and hvac permits for work that will be done. Also informed him about the state statue on him having to live in residence for minimun of two years.
|
ELE16-02913
| Permanent Service | 9/7/2016 | 9/7/2016 | 9/7/2016 1:04:06 PM | P | PASS |
|
|
If you need access inside call daniel ###-####. Thank you Phone #: ###-#### Inspection requested via web by daniel bibikov will need to seperate grounds and neutrals in sub panels p/s o/h rec ok
|
ELE16-02662
| Permanent Service | 9/7/2016 | 9/7/2016 | 9/7/2016 12:50:49 PM | P | PASS |
|
|
service off longer than 1 year; Butch Phone #: ###-#### p/s u/g n ok
|
ELE16-02822
| Final | 9/6/2016 | 9/7/2016 | 9/7/2016 9:30:38 AM | A | PASS |
|
|
Joe Phone #: ###-#### final for service change ok
|
ELE16-02852
| Electrical Rough-In | 9/6/2016 | 9/7/2016 | 9/7/2016 7:32:59 AM | P | PASS |
|
|
Installed outdoor conduit for irrigation pump Phone #: ###-#### Inspection requested via web by Thomas Paterson as per james ady underground ok cover
|
ELE16-01134
| Conference | 9/6/2016 | 9/7/2016 | 9/7/2016 12:00:00 AM | A | DONE |
|
|
We are requesting a conference with the inspector for tomorrow morning. Our contact onsite is Bobby @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate Discussed layout of receptacles in a guest room, talked about article 210.60 and how it also shall comply with 210.52. Receptacles will be arranged to meet proper codes.
|