BLD15-02818
| BLD-Aging Inspection | 9/7/2016 | 9/7/2016 | 9/12/2016 6:25:15 AM | | PEND |
|
|
|
BLD16-00099
| BLD-Aging Inspection | 9/7/2016 | 9/7/2016 | 9/12/2016 6:24:25 AM | | PEND |
|
|
|
BLD16-00147
| BLD-Other | 9/6/2016 | 9/7/2016 | 9/8/2016 7:31:28 AM | A | PART |
|
|
Fire caulking, approved to cover from Mechanical. Need approval to rock 2nd floor complete. Phone #: ###-#### Inspection requested via web by Mike Beeson eastwing ok to cover walls
|
BLD16-01838
| BLD-Ceiling Grid Inspection | 9/6/2016 | 9/7/2016 | 9/8/2016 7:30:26 AM | A | PART |
|
|
Keegan-would like as early AM as possible Phone #: ###-#### front area ok to cover
|
BLD16-01945
| BLD-Framing/Rough-in | 9/6/2016 | 9/7/2016 | 9/8/2016 7:29:56 AM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Matthew Eberhard c/n on site ok to insulate
|
BLD14-02889
| BLD-Wall cover | 9/7/2016 | 9/7/2016 | 9/8/2016 7:29:16 AM | P | PASS |
|
|
Hole patches to enclose utility shaft levels 3 thru 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD16-03196
| BLD-Footing | 9/7/2016 | 9/7/2016 | 9/7/2016 3:54:59 PM | P | PASS |
|
|
Later in the PM for this footing inspection would be great. Marcus will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD16-00434
| BLD-Final | 9/6/2016 | 9/7/2016 | 9/7/2016 1:41:12 PM | P | NR |
|
|
Brenda Phone #: ###-#### needs other trades to final first
|
BLD15-03423
| BLD-Conference | 9/6/2016 | 9/7/2016 | 9/7/2016 9:02:55 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD16-02183
| BLD-Wall Bracing | 9/6/2016 | 9/7/2016 | 9/7/2016 9:02:25 AM | A | PASS |
|
|
Shear // Preston Phone #: ###-####
|