FIR16-00502
| INSP-Sprinkler Rough-in/Hydro | 9/7/2016 | 9/7/2016 | 9/7/2016 1:43:18 PM | P | FAIL |
|
|
The installation does not match plans. Resubmittals are required per the review notes due to the safety factor of the hydraulic calculations. I noted numerous pipe routing changes, added fittings and pendant heads spaced at 16' apart. Riser has not been built yet and the underground supply piping has not been installed yet. Rough-in inspection and hydro test stopped due to the issues.
|
BLD15-04264
| FIRE-Final Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 1:40:33 PM | P | PASS |
|
|
life safety passed
|
FIR16-00474
| INSP-Final Inspection | 9/1/2016 | 9/7/2016 | 9/7/2016 11:15:50 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00476
| INSP-Final Inspection | 9/1/2016 | 9/7/2016 | 9/7/2016 11:15:36 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00475
| INSP-Final Inspection | 9/1/2016 | 9/7/2016 | 9/7/2016 11:15:24 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00364
| INSP-Sprinkler Rough-in/Hydro | 9/6/2016 | 9/7/2016 | 9/7/2016 10:14:10 AM | A | PASS |
|
|
Overhead hydro of all three floors passed.
|
BLD16-03002
| FIRE-Final Inspection | 9/6/2016 | 9/7/2016 | 9/7/2016 10:05:49 AM | A | PASS |
|
|
Life safety passed
|