Inspections for the day of: Thursday, September 7, 2017.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-02953 Electrical Rough-In9/7/20179/7/20179/8/2017 7:46:31 AMAPASS
PLEASE INSPECT ELE PARTIAL ROUGH-IN ALSO.

THANKS Phone #: ###-#### Inspection requested via web by CHRIS CARMINE...

rough for inside of sandshed and underground for service-ok to cover...ok to dump sand in side shed overhead work approved
ELE17-02942 Electrical Rough-In9/7/20179/7/20179/7/2017 2:27:15 PMPPASS
Rough-in of basement addition....end of your day or later in afternoon is preferred if possible... Phone #: ###-#### Inspection requested via web by Sean Patton...

rough ok to cover
ELE17-02735 Electrical Rough-In9/7/20179/7/20179/7/2017 1:51:30 PMPPASS
Upstairs, master bed and bath Phone #: ###-#### Inspection requested via web by Stephanie Huston...

rough ok to cover
ELE17-02899 Electrical Rough-In9/6/20179/7/20179/7/2017 1:29:13 PMPPASS
Please call the number above prior to arrival. Home owner is on site Phone #: ###-#### Inspection requested via web by Cortney Hopper..

rough ok to cover
check at final wire away from attic access and how undercabinet lighting is wired...lv wire rated to be with hv wire in junction box
ELE17-02946 Electrical Rough-In9/7/20179/7/20179/7/2017 12:50:57 PMPPASS
Phone #: ###-#### Inspection requested via web by Barbara Szurgot...

rough ok to cover....new living rm/ hallway wall, new mst bath, needed outlets for wall space, and fan in living rm and wall sconce
ELE17-02508 Electrical Rough-In9/7/20179/7/20179/7/2017 12:23:05 PMPPASS
Call George in advance Phone #: ###-#### Inspection requested via web by Christian Kilpatrick....

listed equipment...ok
ELE17-02962 Temporary Service9/7/20179/7/20179/7/2017 12:00:27 PMPPASS
Greg is the contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker....

ok...job trailer fed from existing panel with rated s/o cord...protected from physical damage
ELE17-02792 Final9/7/20179/7/20179/7/2017 11:29:24 AMPPASS
Phone #: ###-#### Inspection requested via web by Jesse Simpson...

labelling, ocpd, and disconnect...ok
ELE17-02792 Electrical Rough-In9/7/20179/7/20179/7/2017 11:28:50 AMPPASS
Phone #: ###-#### Inspection requested via web by Jesse Simpson....

listed equipment installed...ok
ELE17-02741 Final9/7/20179/7/20179/7/2017 11:27:57 AMPPASS
I will meet you there with the same Panel and optimzers that we use on the roof to show the UL Listings. Phone #: ###-#### Inspection requested via web by Jesse Simpson...

labelling, ocpd, and disconnect...ok to final
ELE17-02741 Electrical Rough-In9/7/20179/7/20179/7/2017 11:27:01 AMPPASS
I will meet you there with the same Panel and optimzers that we use on the roof to show the UL Listings. Phone #: ###-#### Inspection requested via web by Jesse Simpson...

listed equipment...ok
ELE17-02346 Final9/6/20179/7/20179/7/2017 11:00:34 AMAPASS
Late morning if possible please. Thanks Phone #: ###-#### Inspection requested via web by Kevin Burke....

ok to final
ELE17-02953 Rough-In Permanent Service9/6/20179/7/20179/7/2017 10:08:16 AMACANC
PLEASE INSPECT ELE PARTIAL ROUGH-IN ALSO.

THANKS Phone #: ###-#### Inspection requested via web by CHRIS CARMINE...

wrong inspection type...rough inspection scheduled and resulted
ELE17-02956 Electrical Rough-In9/6/20179/7/20179/7/2017 9:32:54 AMAPASS
Phone #: ###-#### Inspection requested via web by Patrick Paz...

upstairs bath remodel....ok...all fished in
ELE17-02543 Electrical Rough-In9/5/20179/7/20179/7/2017 9:11:26 AMACANC
Call Brad 1 hour ahead of time Phone #: ###-#### >> Inspection requested via web by Christian Kilpatrick Inspection cancelled from web by: Christian Kilpatrick
ELE17-02670 Final9/6/20179/7/20179/7/2017 8:55:49 AMAPASS
Phone #: ###-#### Inspection requested via web by Tim Dunlop...

grounding of distribution centers...ok to final
ELE17-02792 Final9/6/20179/7/20179/7/2017 8:15:24 AMAFAIL
Please contact Rob Kelley ###-####, our lead installer, so that he can meet you for the inspection. Phone #: ###-#### Inspection requested via web by Jesse Simpson....

as per Boise City ordinance a rough inspection must be called in first before a final inspection can be scheduled....contractor has been made aware of multiple times...contractor will need to be at inspection with ladder or equipment on the ground to verify listing
ELE17-02741 Final9/6/20179/7/20179/7/2017 8:14:42 AMAFAIL
Please contact Rob Kelley ###-####, our lead installer, so that he can meet you for the inspection. Phone #: ###-#### Inspection requested via web by Jesse Simpson...

as per Boise City ordinance a rough inspection must be called in first before a final inspection can be scheduled....contractor has been made aware of multiple times...contractor will need to be at inspection with ladder or equipment on the ground to verify listing