ELE17-02953
| Electrical Rough-In | 9/7/2017 | 9/7/2017 | 9/8/2017 7:46:31 AM | A | PASS |
|
|
PLEASE INSPECT ELE PARTIAL ROUGH-IN ALSO.
THANKS Phone #: ###-#### Inspection requested via web by CHRIS CARMINE...
rough for inside of sandshed and underground for service-ok to cover...ok to dump sand in side shed overhead work approved
|
ELE17-02942
| Electrical Rough-In | 9/7/2017 | 9/7/2017 | 9/7/2017 2:27:15 PM | P | PASS |
|
|
Rough-in of basement addition....end of your day or later in afternoon is preferred if possible... Phone #: ###-#### Inspection requested via web by Sean Patton...
rough ok to cover
|
ELE17-02735
| Electrical Rough-In | 9/7/2017 | 9/7/2017 | 9/7/2017 1:51:30 PM | P | PASS |
|
|
Upstairs, master bed and bath Phone #: ###-#### Inspection requested via web by Stephanie Huston...
rough ok to cover
|
ELE17-02899
| Electrical Rough-In | 9/6/2017 | 9/7/2017 | 9/7/2017 1:29:13 PM | P | PASS |
|
|
Please call the number above prior to arrival. Home owner is on site Phone #: ###-#### Inspection requested via web by Cortney Hopper..
rough ok to cover check at final wire away from attic access and how undercabinet lighting is wired...lv wire rated to be with hv wire in junction box
|
ELE17-02946
| Electrical Rough-In | 9/7/2017 | 9/7/2017 | 9/7/2017 12:50:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot...
rough ok to cover....new living rm/ hallway wall, new mst bath, needed outlets for wall space, and fan in living rm and wall sconce
|
ELE17-02508
| Electrical Rough-In | 9/7/2017 | 9/7/2017 | 9/7/2017 12:23:05 PM | P | PASS |
|
|
Call George in advance Phone #: ###-#### Inspection requested via web by Christian Kilpatrick....
listed equipment...ok
|
ELE17-02962
| Temporary Service | 9/7/2017 | 9/7/2017 | 9/7/2017 12:00:27 PM | P | PASS |
|
|
Greg is the contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker....
ok...job trailer fed from existing panel with rated s/o cord...protected from physical damage
|
ELE17-02792
| Final | 9/7/2017 | 9/7/2017 | 9/7/2017 11:29:24 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jesse Simpson...
labelling, ocpd, and disconnect...ok
|
ELE17-02792
| Electrical Rough-In | 9/7/2017 | 9/7/2017 | 9/7/2017 11:28:50 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jesse Simpson....
listed equipment installed...ok
|
ELE17-02741
| Final | 9/7/2017 | 9/7/2017 | 9/7/2017 11:27:57 AM | P | PASS |
|
|
I will meet you there with the same Panel and optimzers that we use on the roof to show the UL Listings. Phone #: ###-#### Inspection requested via web by Jesse Simpson...
labelling, ocpd, and disconnect...ok to final
|
ELE17-02741
| Electrical Rough-In | 9/7/2017 | 9/7/2017 | 9/7/2017 11:27:01 AM | P | PASS |
|
|
I will meet you there with the same Panel and optimzers that we use on the roof to show the UL Listings. Phone #: ###-#### Inspection requested via web by Jesse Simpson...
listed equipment...ok
|
ELE17-02346
| Final | 9/6/2017 | 9/7/2017 | 9/7/2017 11:00:34 AM | A | PASS |
|
|
Late morning if possible please. Thanks Phone #: ###-#### Inspection requested via web by Kevin Burke....
ok to final
|
ELE17-02953
| Rough-In Permanent Service | 9/6/2017 | 9/7/2017 | 9/7/2017 10:08:16 AM | A | CANC |
|
|
PLEASE INSPECT ELE PARTIAL ROUGH-IN ALSO.
THANKS Phone #: ###-#### Inspection requested via web by CHRIS CARMINE...
wrong inspection type...rough inspection scheduled and resulted
|
ELE17-02956
| Electrical Rough-In | 9/6/2017 | 9/7/2017 | 9/7/2017 9:32:54 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Patrick Paz...
upstairs bath remodel....ok...all fished in
|
ELE17-02543
| Electrical Rough-In | 9/5/2017 | 9/7/2017 | 9/7/2017 9:11:26 AM | A | CANC |
|
|
Call Brad 1 hour ahead of time Phone #: ###-#### >> Inspection requested via web by Christian Kilpatrick Inspection cancelled from web by: Christian Kilpatrick
|
ELE17-02670
| Final | 9/6/2017 | 9/7/2017 | 9/7/2017 8:55:49 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tim Dunlop...
grounding of distribution centers...ok to final
|
ELE17-02792
| Final | 9/6/2017 | 9/7/2017 | 9/7/2017 8:15:24 AM | A | FAIL |
|
|
Please contact Rob Kelley ###-####, our lead installer, so that he can meet you for the inspection. Phone #: ###-#### Inspection requested via web by Jesse Simpson....
as per Boise City ordinance a rough inspection must be called in first before a final inspection can be scheduled....contractor has been made aware of multiple times...contractor will need to be at inspection with ladder or equipment on the ground to verify listing
|
ELE17-02741
| Final | 9/6/2017 | 9/7/2017 | 9/7/2017 8:14:42 AM | A | FAIL |
|
|
Please contact Rob Kelley ###-####, our lead installer, so that he can meet you for the inspection. Phone #: ###-#### Inspection requested via web by Jesse Simpson...
as per Boise City ordinance a rough inspection must be called in first before a final inspection can be scheduled....contractor has been made aware of multiple times...contractor will need to be at inspection with ladder or equipment on the ground to verify listing
|