ELE16-01134
| Final | 9/7/2017 | 9/7/2017 | 9/7/2017 3:36:23 PM | P | PART |
|
|
LVL 6 rooms and LVL 10 corridor Phone #: ###-#### Inspection requested via web by Clint Tate 6th floor rooms minus 628,627,625,623, 609,610,602, nad king room 620 ok
|
ELE17-02961
| Electrical Rough-In | 9/7/2017 | 9/7/2017 | 9/7/2017 2:01:00 PM | P | CANC |
|
|
*****Please be as LATE in the afternoon as possible**** Phone #: ###-#### Inspection requested via web by Randy Fletcher needed p/s
|
ELE17-02961
| Permanent Service | 9/7/2017 | 9/7/2017 | 9/7/2017 2:00:54 PM | P | PASS |
|
|
*****Please be as LATE in the afternoon as possible**** Phone #: ###-#### Inspection requested via web by Randy Fletcher p/s o/h rec ok
|
ELE17-02152
| Final | 9/6/2017 | 9/7/2017 | 9/7/2017 2:00:08 PM | P | CANC |
|
|
For furnace lines, please call an hour in advance if before 3pm. Phone #: ###-#### Inspection requested via web by Michael Adamson No final at this time furnace rough-in ok
|
ELE17-02745
| Final | 9/7/2017 | 9/7/2017 | 9/7/2017 12:26:45 PM | P | CANC |
|
|
Contact is Mike his cell ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates Needed p/s
|
ELE17-02745
| Permanent Service | 9/7/2017 | 9/7/2017 | 9/7/2017 12:22:25 PM | P | PASS |
|
|
Contact is Mike his cell ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates p/s o/h n ok
|
ELE17-02948
| Conference | 9/6/2017 | 9/7/2017 | 9/7/2017 12:06:23 PM | A | CANC |
|
|
Please call Todd Lanham ###-#### Phone #: ###-#### Inspection requested via web by Kendra Lanham Talked about re-energizing service and moving items to get clearences from panels and meter will give p/s for power to building. All circuits damaged will be replaced
|
ELE17-02948
| Permanent Service | 9/7/2017 | 9/7/2017 | 9/7/2017 12:06:10 PM | P | PASS |
|
|
Please call Todd Lanham ###-#### Phone #: ###-#### Inspection requested via web by Kendra Lanham p/s u/g rec ok
|
ELE17-02351
| Electrical Rough-In | 9/6/2017 | 9/7/2017 | 9/7/2017 10:35:09 AM | A | CANC |
|
|
Call Brad if any questions Phone #: ###-#### Inspection requested via web by Christian Kilpatrick Job will be worked on another day
|
ELE17-02307
| Permanent Service | 9/6/2017 | 9/7/2017 | 9/7/2017 10:33:28 AM | A | PASS |
|
|
I will not be on site. Please call with any questions. Phone #: ###-#### Inspection requested via web by Garrett Collins p/s u/g n ok
|
ELE17-02951
| Final | 9/6/2017 | 9/7/2017 | 9/7/2017 9:32:50 AM | A | PASS |
|
|
4 outlets added on wall where windows were replaced. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Wall was covered up prior to inspection homeowner was told by building inspector he was ok to cover and electrical never got looked at. Final ok
|
ELE17-02952
| Conference | 9/6/2017 | 9/7/2017 | 9/7/2017 9:20:02 AM | A | CANC |
|
|
Please call ahead to meet, bare site - Brian Phone #: ###-#### No conference needed until house is built
|
ELE17-02952
| Temporary Service | 9/7/2017 | 9/7/2017 | 9/7/2017 9:19:55 AM | P | PASS |
|
|
Please call ahead to meet, bare site - Brian Phone #: ###-#### t/s o/h n ok
|
ELE17-02927
| Final | 9/6/2017 | 9/7/2017 | 9/7/2017 8:42:04 AM | A | PASS |
|
|
Kenny Phone #: ###-#### Ground rods installed along stair way Final ok
|
ELE17-02937
| Final | 9/6/2017 | 9/7/2017 | 9/7/2017 8:33:15 AM | A | PASS |
|
|
Chad Van Orden is the contact on site ###-#### Phone #: ###-#### Inspection requested via web by Debby Pierce Service change out final ok
|