Inspections for the day of: Friday, September 7, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-03423 Temporary Service9/7/20189/7/20189/7/2018 2:07:19 PMPPASS
Phone #: ###-#### Inspection requested via web by Dean Gernaat t/s o/h n ok
ELE18-03401 Electrical Rough-In9/6/20189/7/20189/7/2018 2:03:22 PMPPASS
I would like to get a rough-in inspection so they can one side the walls in the commercial area to include interior walls, 2 hour separation wall, and exterior walls. The feeder cable is supposed to arrive next week and will be routed through the attic down into the top of the sub panel. Phone #: ###-#### Inspection requested via web by Ben Garner Ok cover.
ELE18-02676 Final9/7/20189/7/20189/7/2018 1:49:59 PMPPASS
Please call Jimmy with any questions or issues.
###-#### Phone #: ###-#### Inspection requested via web by Kevin Perez Ok final.
ELE18-03437 Permanent Service9/7/20189/7/20189/7/2018 1:49:34 PMPPASS
Phone #: ###-#### Inspection requested via web by Ryan Wilson p/s u/g n ok
ELE18-03437 Electrical Rough-In9/7/20189/7/20189/7/2018 1:48:24 PMPPASS
Phone #: ###-#### Inspection requested via web by Ryan Wilson Ok cover.
ELE18-01666 Final9/5/20189/7/20189/7/2018 1:12:42 PMAPASS
homeowner to be home Phone #: ###-#### Inspection requested via web by Kevin Koomler Ok final.
ELE18-02462 Final9/7/20189/7/20189/7/2018 12:42:34 PMPPASS
Key is front outlet Phone #: ###-#### Inspection requested via web by Kevin Heideman Ok final.
ELE18-01899 Final9/6/20189/7/20189/7/2018 12:33:37 PMACANC
This permit should have been finaled at the same time Altenergy''s solar permit was finaled - not sure why is was not Phone #: ###-#### Inspection requested via web by JENNY EMEL Re-scheduled for 9/10/18.
ELE18-03245 Permanent Service9/6/20189/7/20189/7/2018 10:33:33 AMAPASS
Donny Phone #: ###-#### Talked to Donny on phone and mentioned talking to IDP about 2 in reducer. My need to change to 3 in if meter allows.
ELE18-03384 Rough-In Permanent Service9/6/20189/7/20189/7/2018 10:16:27 AMAPASS
Phone #: ###-#### Inspection requested via web by Dean Gernaat p/s u/g n ok
ELE17-03734 Electrical Rough-In9/6/20189/7/20189/7/2018 9:52:11 AMAPASS
Requesting rough inspection on the back bar and above t-grid ceilings Phone #: ###-#### Inspection requested via web by Clint Tate Ok cover ceiling in kitch area. Back bar ok cover. 1 4sq needs mounted after beer taps installed. Box has grd pigtail.
ELE18-03393 Electrical Rough-In9/6/20189/7/20189/7/2018 9:14:56 AMAPASS
Phone #: ###-#### Inspection requested via web by Mark M Ok cover walls 2 patient care rooms.