Inspections for the day of: Friday, September 7, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-02214 Conference9/7/20189/7/20189/7/2018 3:34:41 PMPDONE
Phone #: ###-#### Inspection requested via web by kendall bender....
discussed requirements for hooking up used equipment
requiring UL listing verification, manufacturers rating, some info of nameplate-draw and OCPD required to protect
discussed power requirement needed for new tennant in space and equipment being hooked up-a load calculation is needed to verify that panel can handle load of used equipment being installed...discussed continous load calc versus noncontinous load on panel
ELE18-02922 Rough-In Permanent Service9/7/20189/7/20189/7/2018 3:18:27 PMPNR
Roughin for walls in office building.
Service for office building
PLEASE inspect as late in the afternoon as possible. we are trying to wrap up today. Phone #: ###-#### Inspection requested via web by Todd Hall...

service not ready....changed to rough for walls
ELE18-02922 Electrical Rough-In9/7/20189/7/20189/7/2018 3:17:43 PMPPASS
Roughin for walls in office building.
Service for office building
PLEASE inspect as late in the afternoon as possible. we are trying to wrap up today. Phone #: ###-#### Inspection requested via web by Todd Hall...

rough in walls only
ELE18-02502 Electrical Rough-In9/7/20189/7/20189/7/2018 1:52:15 PMPPASS
above lay-in ceiling rough in Phone #: ###-#### Inspection requested via web by Brandon Winters...tiles installed before inspection..verified areas opened
ELE18-02696 Final9/7/20189/7/20189/7/2018 1:26:15 PMPPASS
Go around to back door it should be open. Phone #: ###-#### Inspection requested via web by Jose Guerrero...ok to final
ELE18-01172 Final9/7/20189/7/20189/7/2018 12:50:01 PMPPASS
key in front weatherproof cover Phone #: ###-#### Inspection requested via web by Alan Lusk...corrections made...ok to final
MIS18-00323 ELE-Conference8/24/20189/7/20189/7/2018 10:48:30 AMAPASS
verify permit pulled...no permit pulled...owner stated met with Josh Bogel and no electrical will be done...Daryl Degrange to verify
MIS18-00322 ELE-Conference8/24/20189/7/20189/7/2018 10:48:05 AMADONE
check permit pulled...no permit pulled...owner stated met with Josh Bogel and no electrical will be done...Daryl Degrange to verify
ELE18-03404 Electrical Rough-In9/6/20189/7/20189/7/2018 10:42:54 AMAPASS
UFER PLEASE. THANKS Phone #: ###-#### Inspection requested via web by CHRIS CARMINE....concrete encased rebar..ok to cover
ELE18-01520 Final9/6/20189/7/20189/7/2018 10:07:14 AMAPASS
Please call ahead for access, 30 minutes - Mucho Phone #: ###-####....

service complete
new UL listed LED lamps installed in existing lights
ELE18-01881 Electrical Rough-In9/6/20189/7/20189/7/2018 9:07:38 AMAPASS
Jason Curley, crew lead: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting...UL listed equipment verified...panel back of house
ELE18-03340 Rough-In Permanent Service9/6/20189/7/20189/7/2018 8:32:18 AMAPASS
re-inspect Phone #: ###-#### Inspection requested via web by Todd Hall...
rough exterior walls only ok to cover
p/s u/g new ok
ELE18-03277 Final9/6/20189/7/20189/6/2018 5:45:32 PMPCANC
Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
MIS18-00323 ELE-Conference8/24/20189/7/20188/24/2018 11:46:41 AMACANC
bldg and ele work not assoc with hookup