Inspections for the day of: Wednesday, September 8, 1999.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-00420 INSP - Concrete9/7/19999/8/19999/8/1999 12:00:00 AM PART
bob ###-#### ft insp; 9/8 Not pouring garage - setbacks incorrect - remainder ok. jrb
BLD99-02678 INSP - Foundation9/7/19999/8/19999/8/1999 12:00:00 AM PASS
mike-- 866-mike-- rebar insp; 9/8 entered pass. jrb
MEC99-02886 Pressure Test9/7/19999/8/19999/8/1999 12:00:00 AM PASS
PAM-- HOME ###-#### PRE TEST-PER WES APP AT 8:30; 9/8 20psi. jrb
BLD99-02522 INSP - Concrete9/8/19999/8/19999/8/1999 12:00:00 AM PASS
9/8 Entered pass. jrb
BLD99-02522 INSP - Concrete9/7/19999/8/19999/8/1999 12:00:00 AMAFAIL
mana-- ###-#### ft insp; 9/8 Not done. jrb
BLD99-02167 INSP - Wall cover9/7/19999/8/19999/8/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/07/1999 at 15:35:50. Contact: ###-####; 9/8 No one on site. jrb
BLD98-03592 INSP - Final9/8/19999/8/19999/8/1999 12:00:00 AMPPASS
jack ###-####; 9/8 entered pass. jrb
BLD98-01366 INSP - Final9/8/19999/8/19999/8/1999 12:00:00 AMPFAIL
this is for a temp occ / brett ###-#### at 12:30 as per wes; 9/8 Needs other signatures. jrb
MEC99-01158 Final9/7/19999/8/19999/8/1999 12:00:00 AMPPASS
MARTHA ###-####; 9/7 chngd req date frm 9/7 due to entry error-poss dupe jrb 9/8 entered pass. jrb
BLD98-03864 INSP - Final9/3/19999/8/19999/8/1999 12:00:00 AMPPASS
9/8 entered pass. jrb Final reinspect - Teen Cntr. @ Ft. Boise