ELE00-03493
| Permanent Service | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | A | PART |
|
|
Brian ###-#### - conference, check for two grd rds and bond to water? 9/8/2000 4:25:35 PM
|
ELE00-03251
| Electrical Rough-In | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 07:25:03. Contact: . was suppose to be pm insp. 9/8/2000 4:24:55 PM
|
ELE00-03251
| Electrical Rough-In | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 07:26:10. Contact: . walls only, back bathroom - do not cover - has condulet in bottom rt. back wall - needs to be exposed. 9/8/2000 4:27:06 PM
|
ELE00-02658
| Electrical Rough-In | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 07:47:32. Contact: ###-####. was for low voltage - need permit for Tri-State 9/8/2000 4:27:54 PM
|
ELE00-03467
| Electrical Rough-In | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | PASS |
|
|
###-#### corrections made 9/8/2000 4:28:23 PM
|
ELE00-03504
| Rough-In Permanent Service | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | FAIL |
|
|
ron-- ###-#### r/i & ser service ok, r/i had corrections, no windows in building. 9/8/2000 4:29:02 PM
|
ELE00-01859
| Electrical Rough-In | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 11:22:16. Contact: ###-####. late pm 2nd floor
|