Inspections for the day of: Friday, September 8, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMarv Burrus
TitleELE
Phone #340-1297
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE00-01327 Electrical Rough-In9/6/20009/8/20009/8/2000 12:00:00 AMAPART
conference Paula ###-####. range circuit installation 9/10/2000 6:05:01 PM
ELE00-02258 Final9/7/20009/8/20009/8/2000 12:00:00 AMAPASS
John ###-####. completed 9/10/2000 6:04:08 PM
ELE00-01560 Electrical Rough-In9/7/20009/8/20009/8/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/07/2000 at 14:11:34. Contact: . conference; branch-circuit raceway use. 9/10/2000 6:02:54 PM
ELE00-02911 Electrical Rough-In9/7/20009/8/20009/8/2000 12:00:00 AMAPART
conference Jamie ###-#### please call him first . main service panel at garage. 9/10/2000 6:03:46 PM
ELE00-03495 Final9/7/20009/8/20009/8/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/07/2000 at 16:10:49. Contact: ###-####. replace meter and mast damage; perm/svc. 9/10/2000 6:07:50 PM
ELE00-03054 Electrical Rough-In9/8/20009/8/20009/8/2000 12:00:00 AMPPART
sid ###-#### r/i. entry and east perimeter wall 9/10/2000 6:12:56 PM
ELE00-02876 Final9/8/20009/8/20009/8/2000 12:00:00 AMPPASS
wade--- ###-#### fn. completed. 9/10/2000 6:14:40 PM
ELE00-03502 Electrical Rough-In9/8/20009/8/20009/8/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/08/2000 at 09:15:04. Contact: ###-####. American Resergents office walls r/i. 9/10/2000 6:14:09 PM
ELE00-02983 Final9/8/20009/8/20009/8/2000 12:00:00 AMPCANC
SHAWN PAGER -- ###-#### FN. called in wrong permit number. 9/10/2000 6:15:25 PM
ELE99-01707 Electrical Rough-In9/7/20009/8/20009/8/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/07/2000 at 15:21:08. Contact: ###-####. 2nd floor corridor ceiling r/i. 9/10/2000 6:09:32 PM