Inspections for the day of: Friday, September 8, 2000.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02225 BLD-Final9/7/20009/8/20009/8/2000 12:00:00 AMAFAIL
GREGG-- ###-#### FN
BLD00-01310 BLD-Final9/7/20009/8/20009/8/2000 12:00:00 AMANR
Elliot ###-#### no finals elec ect.........
9/8/2000 9:56:37 AM
BLD00-02002 BLD-Framing/Rough-in9/7/20009/8/20009/8/2000 12:00:00 AMANR
Elliot ###-#### no three green stickers 9/8/2000 9:57:10 AM
BLD00-00168 BLD-Final9/7/20009/8/20009/8/2000 12:00:00 AMANR
Elliot ###-####
BLD00-00847 BLD-Final9/7/20009/8/20009/8/2000 12:00:00 AMANR
Elliot ###-#### no elec final 9/8/2000 9:46:42 AM
BLD99-02200 BLD-Framing/Rough-in9/7/20009/8/20009/8/2000 12:00:00 AMPPART
Don ###-#### cn ok per 340 9/8/2000 12:30:26 PM
BLD00-00829 BLD-Framing/Rough-in9/7/20009/8/20009/8/2000 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/07/2000 at 12:00:48. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/08/2000 at 07:54:40.
BLD00-02471 BLD-Footing9/8/20009/8/20009/8/2000 12:00:00 AMPPART
ready at 2 ###-####
BLD00-02197 BLD-Framing/Rough-in9/8/20009/8/20009/8/2000 12:00:00 AMPPART
###-#### check load on window frame 9/8/2000 2:28:09 PM
BLD00-02555 BLD-Framing/Rough-in9/8/20009/8/20009/8/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/08/2000 at 09:43:06. Contact: ###-####. cn posted 9/8/2000 1:26:44 PM
BLD00-01474 BLD-Framing/Rough-in9/8/20009/8/20009/8/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/08/2000 at 09:57:24. Contact: ###-####. new cn issued 9/8/2000 2:28:49 PM
BLD99-01704 BLD-Energy code compliance9/8/20009/8/20009/8/2000 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/08/2000 at 10:49:37. Contact: ###-####. 9/8/2000 1:26:23 PM canc by contractor 9/8/2000 1:45:50 PM
BLD00-01786 BLD-Conference9/8/20009/8/20009/8/2000 12:00:00 AMPPASS
Added by Inspector: 408 On 9/8/2000 conf on project first inspection 9/8/2000 11:48:49 AM
BLD99-00078 BLD-Final9/5/20009/8/20009/8/2000 12:00:00 AMPPASS
Laura ###-#### also a mech final
BLD00-02615 BLD-Final9/7/20009/8/20009/8/2000 12:00:00 AMPNR
Bob ###-#### lot clear no ans on phone 9/11/2000 8:00:06 AM