FIR99-00617
| INSP-Sprinkler Rough-in/Hydro | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 09:28:04. Contact: ###-####. minor corrections were fixed - okay to cover - still need hydro 9/8/2000 9:56:50 AM
|
BLD00-01305
| FIRE-Final Inspection | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | NR |
|
|
Jill ###-#### Ogata called and said they won't be ready until 9/11/2000 9/8/2000 12:39:36 PM
|
BLD99-01716
| FIRE-Final Inspection | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | NR |
|
|
frank ###-#### Dan called and said they won't be ready until Monday. I called Mike and requested Tuesday as I am off on Monday 9/8/2000 12:40:44 PM
|
BLD99-01723
| FIRE-Final Inspection | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | NR |
|
|
frank ###-#### Dan called and said he won't be ready until Monday. I called Mike and requested tuesday as I am off on Monday 9/8/2000 12:41:33 PM
|
BLD00-01305
| FIRE-Final Inspection | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 409 On 9/8/2000 emergency light not working; basement door not latching; hard lid under stairs has large gaps; wrong hardware on bathroom door; sign above main exit for key locking; handicap sign on bathroom
|
BLD00-01893
| FIRE-Final Inspection | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | PASS |
|
|
Greg Adams pager # ###-#### 99710 told Greg we would review the corridor situation on the upcoming TI work. The duct entering the corridor from the RM TI doesn't open into the corridor. 9/8/2000 3:43:18 PM
|