Inspections for the day of: Friday, September 8, 2000.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-01432 Rough-in9/7/20009/8/20009/8/2000 12:00:00 AMACANC
CALL 1ST BEFORE SCOTT ###-#### R/I...not ready 9/8/2000 9:51:49 AM
MEC00-01432 Pressure Test9/7/20009/8/20009/8/2000 12:00:00 AMACANC
SCOTT ###-#### CALL 1ST BEFORE INSP
MEC00-02729 Pressure Test9/7/20009/8/20009/8/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/07/2000 at 11:36:10. Contact: ###-####. FOR THE BARBEQUE
MEC00-02282 Final9/7/20009/8/20009/8/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/07/2000 at 12:16:40. Contact: ###-####.
MEC00-02958 Rough-in9/7/20009/8/20009/8/2000 12:00:00 AMAPASS
Liberty Heating ###-####
MEC00-02963 Rough-in9/7/20009/8/20009/8/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/07/2000 at 15:16:45. Contact: ###-####.
MEC00-02963 Pressure Test9/7/20009/8/20009/8/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/07/2000 at 15:17:30. Contact: ###-####.
MEC00-02976 Final9/7/20009/8/20009/8/2000 12:00:00 AMAFAIL
furance a/c gas test rudy ###-#### after 9:00 please called phone #..nobody knew what i was talking about..rudy wasnt there 9/8/2000 12:01:30 PM
MEC00-02463 Final9/7/20009/8/20009/8/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/07/2000 at 15:51:29. Contact: (208) ...corrections posted 9/8/2000 9:51:26 AM
MEC99-04357 Final9/7/20009/8/20009/8/2000 12:00:00 AMAFAIL
as per Dixie correction not done 9/8/2000 9:16:53 AM
MEC00-02321 Final9/8/20009/8/20009/8/2000 12:00:00 AMPFAIL
Jerry ###-#### a/c to be 3 9/8/2000 3:39:28 PM
MEC00-03020 Rough-in9/8/20009/8/20009/8/2000 12:00:00 AMPPASS
###-####
MEC00-03020 Pressure Test9/8/20009/8/20009/8/2000 12:00:00 AMPPASS
MEC00-03004 Rough-in9/8/20009/8/20009/8/2000 12:00:00 AMPPASS
pat ###-#### r/i--re-insp
MEC00-03015 Final9/8/20009/8/20009/8/2000 12:00:00 AMPPASS
Shawn ###-#### gas test and a hook up to bbq
MEC00-01949 Final9/8/20009/8/20009/8/2000 12:00:00 AMPFAIL
Dwyane ###-#### alan did this 9/8/2000 12:35:16 PM done by 415 9/8/2000 1:00:10 PM
MEC00-03023 Final9/8/20009/8/20009/8/2000 12:00:00 AMPPASS
for homeowner call 1st before insp mike--cell--###-#### f/p
MEC00-03026 Rough-in9/8/20009/8/20009/8/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/08/2000 at 10:03:23. Contact: ###-####....###-#### 9/8/2000 12:31:52 PM..turn right on 11th off fort 9/8/2000 12:34:27 PM
MEC00-03017 Pressure Test9/8/20009/8/20009/8/2000 12:00:00 AMPFAIL
Scheduled by Inspector: 415 On 9/8/2000 ###-#### 9/8/2000 10:17:03 AM nobody home..left notice 9/8/2000 1:31:08 PM
MEC00-03030 Final9/8/20009/8/20009/8/2000 12:00:00 AMPFAIL
Sherri ###-#### hooked up existing duct work and PREP for a/c-The permit is only for duct work nothing else.Everything else was existing as per Classic
MEC00-02112 Final9/8/20009/8/20009/8/2000 12:00:00 AMPFAIL
Added by Inspector: 411 On 9/8/2000 corrections posted
MEC00-02736 Pressure Test9/8/20009/8/20009/8/2000 12:00:00 AMPFAIL
Added by Inspector: 411 On 9/8/2000 gas test done by 350 on aug 23rd