MEC00-01775
| Final | 9/6/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/06/2000 at 15:52:30. Contact: ###-####.
c/n posted on 1.5" straps on ducts 9/8/2000 9:50:34 AM
|
BLD00-02125
| BLD-Framing/Rough-in | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | A | PART |
|
|
for cover Marty ###-####
ok to cover 2nd story,, duplex 9/8/2000 9:15:18 AM
|
BLD00-02348
| BLD-Footing | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | A | PART |
|
|
John ###-####
ok ,,wip 9/8/2000 11:34:25 AM
|
MEC00-03017
| Pressure Test | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 15:26:30. Contact: ###-####.
|
BLD00-02312
| BLD-Foundation | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 15:26:32. Contact: ###-####.
wip, ok 9/8/2000 11:27:14 AM
|
BLD00-01548
| BLD-Energy code compliance | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 15:40:02. Contact: ###-####.
verify energy code doc. at final 9/8/2000 12:23:03 PM
|
BLD00-00784
| BLD-Final | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | A | PASS |
|
|
###-####
c of c issued #19735 9/8/2000 2:53:33 PM
|
BLD00-02630
| BLD-Other | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 16:42:43. Contact: .
|
BLD00-02341
| BLD-Foundation | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 08:07:08. Contact: ###-####.
wip,, ok w/ verbal corrections 9/8/2000 4:30:09 PM
|
BLD00-02469
| BLD-Foundation | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | PART |
|
|
Ryan ###-####
poured ,,, ok 9/8/2000 3:04:09 PM
|
BLD00-02063
| BLD-Framing/Rough-in | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | PART |
|
|
###-####--john -shear nail insp
outside shear ok. 9/8/2000 3:34:07 PM
|
BLD00-01927
| BLD-Framing/Rough-in | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | NR |
|
|
Jim ###-####
need trade signoff 9/8/2000 1:05:48 PM
|
BLD00-02519
| BLD-Footing | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | PART |
|
|
ft tim ###-####
wip 9/8/2000 3:41:03 PM
|
BLD00-02252
| BLD-Conference | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | CANC |
|
|
FOR HOMEOWNER--BOB --###-#### WORK FOR CONF-LOCATED IN BACK ON PRO
done by tom 9/11/2000 5:06:34 PM
|
BLD00-01823
| BLD-Framing/Rough-in | 9/8/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 11:11:50. Contact: ###-####.
c/n left, misc. items 9/8/2000 2:35:23 PM
|
BLD00-00967
| BLD-Energy code compliance | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | PASS |
|
|
George Pierce ###-####
ok to cover 9/8/2000 4:45:55 PM
|
BLD00-01552
| BLD-Framing/Rough-in | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 15:10:40. Contact: ###-####.
|
BLD00-02060
| BLD-Wall cover | 9/7/2000 | 9/8/2000 | 9/8/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 11:04:01. Contact: ###-####.
no plans on site 9/8/2000 12:50:56 PM
|