Inspections for the day of: Monday, September 8, 2003.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00204 FIR-Aging Inspection9/8/20039/8/20039/8/2003 12:00:00 AM PASS
work still in progress 9/8/2003 7:19:12 AM
BLD03-01116 FIRE-Final Inspection9/5/20039/8/20039/8/2003 12:00:00 AMAFAIL
JENNY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks Need fire sprinkler plans; sprinkler head needed in walk-in cooler; sprinkler head too close to wall by beverage area and overspaced from north wall; need 401 canopies on all sprinkler heads; post maximum load 79 sign at main exit; provide emergency lighthing as shown on plans; provide air balance report; install "Door to remain unlocked..." sign at main exit; doors A and E to be openable from the inside without special knowledge - plans show panic hardware; submit alarm plans for new hood extinguishing system 9/8/2003 10:17:18 AM
FIR03-00133 INSP-Supply line flush9/5/20039/8/20039/8/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 9/5/2003 at 1:24:30 PM. Contact: ###-####. UG hydro okay; will give ther UG certificate to Troy 9/8/2003 11:08:56 AM
BLD03-01634 FIRE-Final Inspection9/5/20039/8/20039/8/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/5/2003 at 1:47:56 PM. Contact: ###-####.
FIR03-00509 INSP-Final Inspection9/8/20039/8/20039/8/2003 12:00:00 AMAPASS
FIR03-00347 INSP-Sprinkler Rough-in/Hydro9/8/20039/8/20039/8/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 9/8/2003 at 9:30:32 AM. Contact: ###-####. okay to cover northwest side of new addition 9/8/2003 4:06:24 PM
FIR03-00141 INSP-Final Inspection9/8/20039/8/20039/8/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 9/8/2003 at 10:16:11 AM. Contact: ###-####. need initiating devices only for maps - they currently have notification devices and initiating; relocate PIV to NW corner of building 9/8/2003 4:18:59 PM
FIR03-00239 INSP-Sprinkler Rough-in/Hydro9/8/20039/8/20039/8/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 9/8/2003 at 8:11:17 AM. Contact: ###-####. okay to cover up base of riser and 22 thrust block to west of riser 9/8/2003 12:50:06 PM
BLD02-02768 FIRE-Final Inspection9/8/20039/8/20039/8/2003 12:00:00 AMPCANC
###-#### sid rescheduled for 9/9 9/8/2003 4:08:16 PM