BLD05-01347
| BLD-Final | 9/7/2005 | 9/8/2005 | 9/8/2005 3:38:41 PM | P | PART |
|
|
###-#### OK for Temp Occ. C/N.....OK for Perm Occ when Electr signs off for Perm Occ. Obtain Perm Occ status within 90 days of this notice.
|
BLD05-00706
| BLD-Final | 9/8/2005 | 9/8/2005 | 9/8/2005 3:21:59 PM | P | PASS |
|
|
tim ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles C/C issued
|
BLD05-00496
| BLD-Framing/Rough-in | 9/2/2005 | 9/8/2005 | 9/8/2005 3:15:18 PM | P | PASS |
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-01883
| BLD-Framing/Rough-in | 9/8/2005 | 9/8/2005 | 9/8/2005 2:48:41 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 9/8/2005 at 7:47:41 AM. Contact: ###-####.
|
BLD05-01769
| BLD-Framing/Rough-in | 9/8/2005 | 9/8/2005 | 9/8/2005 2:16:33 PM | P | PASS |
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD04-02020
| BLD-Framing/Rough-in | 9/7/2005 | 9/8/2005 | 9/8/2005 2:06:40 PM | A | PART |
|
|
Scheduled by a contractor via Hello! on 9/7/2005 at 4:02:28 PM. Contact: ###-####.
|
BLD05-00780
| BLD-Conference | 9/7/2005 | 9/8/2005 | 9/8/2005 10:58:49 AM | A | PASS |
|
|
Requesting inspection of wall insulation and authorization to cover Dean; Phone #: ###-#### Energy Pass
|
MIS05-00120
| BLD-Final | 9/7/2005 | 9/8/2005 | 9/8/2005 10:38:26 AM | A | FAIL |
|
|
denise henderson ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie M.G. East on Irving......go all the way to the end. C/N Handrails
|
BLD04-02934
| BLD-Foundation | 9/7/2005 | 9/8/2005 | 9/8/2005 10:15:29 AM | A | PASS |
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Letter from Eng. 2500 psi design No special insp Req. Wall taller than what shows on appr plan.......Eng letter OK'd change...... Need to add additional horiz bar.....inspected and Ok'd as instructed by Eng. Found wall OK.
|
BLD05-00706
| DOC - Permit Finaled | 9/8/2005 | 9/8/2005 | 9/8/2005 12:00:00 AM | P | PASS |
|
|
|