Inspections for the day of: Monday, September 8, 2008.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00390 FIR-Aging Inspection9/8/20089/8/20089/9/2008 11:37:47 AM NR
Work is in progress
FIR08-00553 INSP-Final Inspection9/8/20089/8/20089/9/2008 11:05:13 AMPCANC
Wrong inspection number.
FIR08-00188 INSP-Sprinkler Rough-in/Hydro9/5/20089/8/20089/8/2008 3:47:06 PMAPASS
The remaining sprinkler piping above the lay-in ceilings can be covered.
FIR08-00531 INSP-Sprinkler Rough-in9/5/20089/8/20089/8/2008 1:39:59 PMAFAIL
The inspection started and ended in the Sanctuary. The piping in the remote area is shown as 2" on the city approved plans. As installed the piping appears to be 1 1/4" or 1 1/2". Plans need to be resubmitted or the approved sized piping needs to be installed. I looked at the hydraulic calculations to verify actual pipe size but node points are missing on the plans and center to center lengths do not match. Similiarly a branchline on the north side of the building is shown to go from 1 1/4" in size to 1 1/2" then back to 1 1/4". I did not verify if it had been installed that way yet. Also lag bolts have been used to attach the earthquake braces to the structure which is not allowed per NFPA 13. From the floor it does not appear that the side sammy's supporting the main piping have not been mounted the required 3" minimum distance from the bottom of the cord. Also sprinkler protection is required in the area where the speakers will be mounted. The inspection was stopped at this point until all pipe sizing is verified and the earthquake bracing/hangers are addressed.