ESC09-00561
| Site Preparation | 9/8/2009 | 9/8/2009 | 9/15/2009 4:04:48 PM | | NR |
|
|
|
PLM09-00745
| Plumbing Rough-in | 9/8/2009 | 9/8/2009 | 9/8/2009 4:26:38 PM | P | PART |
|
|
Dan\Final on the trim Phone #: ###-####-need seperate permit for clawfoot tub in order to final permit.
|
PLM09-01199
| Final | 9/8/2009 | 9/8/2009 | 9/8/2009 3:53:29 PM | P | PASS |
|
|
unit 556
|
PLM09-01430
| Sprinkler (Final) | 9/8/2009 | 9/8/2009 | 9/8/2009 3:24:32 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Renee Zahorik-need to grade back to drain down valve & have dbca tested & certified.
|
PLM09-01481
| Plumbing Rough-in | 9/7/2009 | 9/8/2009 | 9/8/2009 2:57:52 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Bette Lee
|
ESC09-00445
| General Inspection | 9/8/2009 | 9/8/2009 | 9/8/2009 2:57:28 PM | P | FAIL |
|
|
left verbal correction with rp to provide a trash container & clean up trash & concrete spoil pile on west side. will reinspect 9-10-09 am.
|
ESC09-00492
| Random Inspection | 9/8/2009 | 9/8/2009 | 9/8/2009 2:40:28 PM | P | FAIL |
|
|
left verbal correction with rp that his concrete truck was washing out on ground & no concrete washout pit has been provided for washout.will have pit by 9-9-09 am. will reinspect 9-9-09 pm.
|
PLM09-01362
| Final | 9/8/2009 | 9/8/2009 | 9/8/2009 2:17:51 PM | P | PART |
|
|
need to install mop sink & have dbca tested & certified.
|
PLM09-00758
| Water and/or Sewer | 9/8/2009 | 9/8/2009 | 9/8/2009 1:41:03 PM | P | PART |
|
|
start 24 hr test on interceptor.
|
PLM09-01362
| Final | 9/7/2009 | 9/8/2009 | 9/8/2009 11:16:03 AM | A | NR |
|
|
thank you we will be ready later in the morning. all we have to do is set 2-toilets and 1 sink. Phone #: ###-#### Internet Inspection Request from: Aaron Johns
|
ESC09-00160
| BMP Violation | 9/4/2009 | 9/8/2009 | 9/8/2009 10:18:20 AM | A | PART |
|
|
sod will be installed by weeks end, working on silt fence silk.
|
ESC09-00559
| Site Preparation | 9/8/2009 | 9/8/2009 | 9/8/2009 9:36:00 AM | | PASS |
|
|
|
ESC09-00428
| Site Preparation | 9/8/2009 | 9/8/2009 | 9/8/2009 9:05:47 AM | | FAIL |
|
|
left verbal correction with rp via voicemail to post esc sign, provide a concrete washout pit before next pour and slopes over 2 percent grade require sediment barriers. will reinspect 9-9-09 pm.
|
ESC09-00429
| Site Preparation | 9/8/2009 | 9/8/2009 | 9/8/2009 9:05:20 AM | | FAIL |
|
|
left verbal correction with rp via voicemail to post esc sign, provide a concrete washout pit before next pour and slopes over 2 percent grade require sediment barriers. will reinspect 9-9-09 pm.
|
ESC09-00426
| Site Preparation | 9/8/2009 | 9/8/2009 | 9/8/2009 9:04:38 AM | | FAIL |
|
|
left verbal correction with rp via voicemail to post esc sign, provide a concrete washout pit before next pour and slopes over 2 percent grade require sediment barriers. will reinspect 9-9-09 pm.
|
ESC09-00339
| BMP Violation | 9/3/2009 | 9/8/2009 | 9/8/2009 8:38:25 AM | A | PASS |
|
|
|