Inspections for the day of: Wednesday, September 8, 2010.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00389 INSP-Final Inspection9/8/20109/8/20109/9/2010 7:51:26 AMPCANC
Inspection was a conference since the project related fire alarm permit is not ready
FIR10-00342 INSP-Final Inspection9/7/20109/8/20109/9/2010 7:48:44 AMAFAIL
Waiting for the project related fire alarm permit to be passed.
FIR10-00342 INSP-Sprinkler Rough-in/Hydro9/7/20109/8/20109/8/2010 1:26:57 PMAPASS
Overhead hydro test and forward flush passed.
BLD10-00973 FIRE-Final Inspection9/8/20109/8/20109/8/2010 1:25:51 PMPFAIL
Need to provide emergency lights as shown on the approved plans or get plan reviews ok they can be deleted. The exit signs need to tested. The building shell building permit needs to be finaled as well.
FIR10-00195 INSP-Final Inspection9/8/20109/8/20109/8/2010 11:07:55 AMPPASS
Life safety passed
BLD10-00612 FIRE-Final Inspection9/8/20109/8/20109/8/2010 11:07:34 AMPPASS
Permit finaled
BLD09-00946 FIRE-Final Inspection9/8/20109/8/20109/8/2010 11:07:03 AMPPASS
life safety passed
BLD09-00945 FIRE-Final Inspection9/8/20109/8/20109/8/2010 11:06:11 AMPPASS
Life safety passed.
FIR09-00601 INSP-Final Inspection9/7/20109/8/20109/8/2010 9:31:23 AMAPASS
Permit finaled
FIR10-00225 INSP-Final Inspection9/7/20109/8/20109/8/2010 9:30:59 AMAPASS
Permit finaled
FIR10-00013 INSP-Final Inspection9/7/20109/8/20109/8/2010 9:30:30 AMAPASS
Permit finaled
FIR09-00635 INSP-Final Inspection9/7/20109/8/20109/8/2010 9:29:58 AMAPASS
Permit finaled