BLD16-01759
| BLD-Other | 9/8/2016 | 9/8/2016 | 9/8/2016 12:00:00 AM | A | PEND |
|
|
Work in progress (slow). Some patios have had structural elements removed for replacement. No new stairways have been installed. There are three existing stairways at Curtis entrance to site that will have to be verified. Some trade work in progress.
|