ELE13-00255
| ELE-Aging Inspection | 9/8/2016 | 9/8/2016 | 9/9/2016 4:38:07 PM | | PASS |
|
|
Waiting on contractor
|
ELE09-01607
| ELE-Aging Inspection | 9/8/2016 | 9/8/2016 | 9/9/2016 4:26:19 PM | | PASS |
|
|
Unable to locate phone number
|
ELE16-02886
| Rough-In Permanent Service | 9/7/2016 | 9/8/2016 | 9/8/2016 4:06:16 PM | A | NR |
|
|
Dual 200 meter base ; grounding. Phone #: ###-#### Inspection requested via web by David McClellan Will reschedule for 9-9-16. Location of service will be in conflict if rezoned for town houses it is located on what would be property line and dividing wall. No penetrations in 2 hour firewall.
|
ELE15-01348
| Electrical Rough-In | 9/6/2016 | 9/8/2016 | 9/8/2016 3:48:16 PM | P | PASS |
|
|
elevator lobby ceilings, levels 6-9. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson 9th floor elevator lobby not ready. 6, 7, 8th floor elevator lobby ceilings rough in ok cover.
|
ELE16-02600
| Electrical Rough-In | 9/8/2016 | 9/8/2016 | 9/8/2016 2:47:42 PM | P | CANC |
|
|
Dave. 1st floor lobby bathrooms ; 2nd floor common area wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Duplicate request.
|
ELE16-02600
| Electrical Rough-In | 9/8/2016 | 9/8/2016 | 9/8/2016 2:47:08 PM | P | PASS |
|
|
Dave. 1st floor lobby bathrooms ; 2nd floor common area wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy 1st floor conference rm, west elevator lobby walls and hardlids, bathroom walls and hardlids, valet walls. 2nd floor offices, gym, bath walls and hardlids, hospitality rm wall and hardlid, hold on hospitality bath ceiling accesses not framed yet. areas noted rough in ok cover
|
ELE16-02600
| Conference | 9/7/2016 | 9/8/2016 | 9/8/2016 2:39:42 PM | P | DONE |
|
|
Sean. Design team wanted to conference on additional outlets requested under 210.60. Can you call 1/2 hour prior to heading to the site. Phone #: ###-#### Inspection requested via web by Sean DeLacy Will meet 9-10-16 9 am to sign off on room layouts when furniture is visible on drawings.
|
ELE16-00089
| Electrical Rough-In | 9/8/2016 | 9/8/2016 | 9/8/2016 11:50:33 AM | A | PASS |
|
|
Call Bob for inspection of 2nd floor soffits. Phone #: ###-#### Inspection requested via web by Rafael Castillo District kitchen transformer, Generator on floor 3 parking garage grounding corrected, and level 2 stair 5 lobby soffit cans rough in ok cover
|
ELE14-01611
| Final | 9/7/2016 | 9/8/2016 | 9/8/2016 11:16:51 AM | A | FAIL |
|
|
call dave for access ###-#### Phone #: ###-#### Inspection requested via web by danny perrine 210.52- A receptacle outlet shall be located at end of peninsula in kitchen. 300.15- Washer wire hanging in basement shall be secured and installed in a box and trimmed. 334.30- 10-3 for dryer shall be secured and box mounted. 400.8- Extension cord feeding washer shall be removed. 408.4- Panel covers shall be installed and labelled.
|
ELE16-02855
| Electrical Rough-In | 9/7/2016 | 9/8/2016 | 9/8/2016 10:39:46 AM | A | PASS |
|
|
We will be onsite and will meet you there. Phone #: ###-#### Inspection requested via web by Matthew Dunay Listing confirmed rough in ok
|
ELE16-02859
| Permanent Service | 9/7/2016 | 9/8/2016 | 9/8/2016 8:26:55 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tracy Robertson p/s u/g n ok
|