NAF16-00007
| INSP-Sprinkler Rough-in/Hydro | 9/7/2016 | 9/8/2016 | 9/8/2016 1:13:33 PM | A | PASS |
|
|
Hydrostatic test for all flrs and remote fdc completed satisfactory. FDC roughin complete. Heat trace on third floor installed.
Tenting inspection on third floor: at the time of inspection tenting was satisfactory.
|