ELE17-02810
| Final | 9/8/2017 | 9/8/2017 | 9/8/2017 3:21:02 PM | P | PASS |
|
|
Call Gary when in route if possible. Obtain visitors badge at front desk. Phone #: ###-#### Inspection requested via web by Steve McCloy No card posted. Final ok
|
ELE17-02810
| Electrical Rough-In | 9/8/2017 | 9/8/2017 | 9/8/2017 3:09:40 PM | P | PASS |
|
|
Call Gary when in route if possible. Obtain visitors badge at front desk. Phone #: ###-#### Inspection requested via web by Steve McCloy All wiring fished in. rough in ok.
|
ELE17-02965
| Rough-In Permanent Service | 9/8/2017 | 9/8/2017 | 9/8/2017 3:09:02 PM | P | PASS |
|
|
###-#### Rough in ok cover p/s u/g n ok
|
ELE17-02970
| Electrical Rough-In | 9/7/2017 | 9/8/2017 | 9/8/2017 2:20:00 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Cindie Swaim At time of inspection rack system and array panels being installed. No raceways or wiring to service installed yet. Listing confirmed on enphase micro inverters and panels. rough in ok
|
ELE17-02569
| Electrical Rough-In | 9/7/2017 | 9/8/2017 | 9/8/2017 1:41:32 PM | P | PASS |
|
|
Requesting a Ceiling Grid inspection for PM tomorrow. Please call Lynn prior to inspection. Phone #: ###-#### Inspection requested via web by Lynn Proctor South fitness area grid only rough in ok cover
|
ELE16-03932
| Electrical Rough-In | 9/8/2017 | 9/8/2017 | 9/8/2017 12:20:21 PM | A | PASS |
|
|
dropped lids units 723-725, units 728-732 Phone #: ###-#### Inspection requested via web by Cathy Duchek Rooms noted signed off in office. Rough in ok cover
|
ELE17-02791
| Electrical Rough-In | 9/8/2017 | 9/8/2017 | 9/8/2017 11:56:32 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 11th floor wall rough in ok cover
|
ELE17-02862
| Electrical Rough-In | 9/7/2017 | 9/8/2017 | 9/8/2017 11:40:31 AM | A | PASS |
|
|
UFER grounding Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Concrete encased electrode and N.W. basement wall pour rough in ok cover.
|
ELE17-02724
| Electrical Rough-In | 9/7/2017 | 9/8/2017 | 9/8/2017 11:30:42 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Wrong permit requested needed 11th floor on different permit.
|
ELE17-02926
| Final | 9/7/2017 | 9/8/2017 | 9/8/2017 10:05:45 AM | A | PASS |
|
|
Randy Phone #: ###-#### Final ok
|
ELE17-02926
| Electrical Rough-In | 9/8/2017 | 9/8/2017 | 9/8/2017 10:05:32 AM | P | PASS |
|
|
Randy Phone #: ###-#### Underground to well rough in ok cover
|
ELE17-02939
| Temporary Service | 9/7/2017 | 9/8/2017 | 9/8/2017 9:46:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Grundhauser t/s u/g n ok
|
ELE17-02965
| Rough-In Permanent Service | 9/7/2017 | 9/8/2017 | 9/8/2017 9:28:20 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk 110.3- Branch circuit for furnace shall be sized as per manufacturers instructions. 15 amp installed 20 amp and 12 ga. required. Contactor to check with manufacturer for correct circuit. 408.3(B)(2)- Barriers shall be in place at line side termination of panel board. OK insulate only
|