PLM17-00575
| PLM-Aging Inspection | 9/8/2017 | 9/8/2017 | 9/8/2017 3:01:11 PM | | PASS |
|
|
|
PLM16-03859
| PLM-Aging Inspection | 9/8/2017 | 9/8/2017 | 9/8/2017 2:43:32 PM | | PEND |
|
|
Spoke with the homewoner-still working on it
|
PLM17-02811
| Plumbing Rough-in | 9/7/2017 | 9/8/2017 | 9/8/2017 2:41:11 PM | P | PART |
|
|
Rough-in WALL COVER, if questions call Ryan @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. Walls ok to cover
|
PLM17-00333
| Water Softner Final | 9/1/2017 | 9/8/2017 | 9/8/2017 2:23:28 PM | P | PASS |
|
|
Inspection requested via web by Diana Lund
|
PLM17-02384
| Water Softner Final | 9/1/2017 | 9/8/2017 | 9/8/2017 2:05:03 PM | P | NH |
|
|
Inspection requested via web by Diana Lund. Tagged door
|
PLM17-03427
| Plumbing Rough-in | 9/7/2017 | 9/8/2017 | 9/8/2017 1:52:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03428
| Plumbing Rough-in | 9/7/2017 | 9/8/2017 | 9/8/2017 1:47:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03379
| Final | 9/8/2017 | 9/8/2017 | 9/8/2017 1:15:41 PM | P | PASS |
|
|
Please call homeowner for access at ###-#### and Eddie with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs
|
PLM17-03396
| Water Heater Final | 9/6/2017 | 9/8/2017 | 9/8/2017 11:53:34 AM | A | PASS |
|
|
AFTER 10:00 AM IF POSSIBLE. PLEASE CALL AHEAD TO MEET ###-#### Phone #: ###-#### Inspection requested via web by Chris Field
|
PLM17-03341
| Final | 9/7/2017 | 9/8/2017 | 9/8/2017 11:19:15 AM | A | CANC |
|
|
Brad-husband-would like after 10 if possible Phone #: ###-####. Changed to rough-in
|
PLM17-03341
| Plumbing Rough-in | 9/8/2017 | 9/8/2017 | 9/8/2017 11:18:55 AM | A | PASS |
|
|
Brad-husband-would like after 10 if possible Phone #: ###-####
|
PLM17-02945
| Final | 9/6/2017 | 9/8/2017 | 9/8/2017 10:30:26 AM | A | PASS |
|
|
Homeowners Dorothea ; Carroll Ross ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM17-02593
| Final | 9/7/2017 | 9/8/2017 | 9/8/2017 10:14:43 AM | A | PASS |
|
|
Hi lo df installed, contractor will build out around it. Code 4584 Phone #: ###-#### Inspection requested via web by Boe Jares
|
PLM17-03426
| Other | 9/7/2017 | 9/8/2017 | 9/8/2017 9:56:32 AM | A | PEND |
|
|
Meeting- Soubanh Phone #: ###-####. Recommendations: Fire Damage 1. Replace all boiler drains with frost proof wall hydrants at exterior locations. 2. Replace all plastic water lines.. 3. Replace the damaged ABS to the upstairs bathrooms. 4. Replace the smoke damaged water heater.
|
PLM16-02666
| PLM-Aging Inspection | 9/8/2017 | 9/8/2017 | 9/8/2017 9:31:05 AM | | PEND |
|
|
|
PLM17-03397
| Plumbing Rough-in | 9/6/2017 | 9/8/2017 | 9/8/2017 9:06:33 AM | A | PASS |
|
|
We are requesting a plumbing rough-in inspection. Contact Luke Karel: ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel
|
PLM17-03302
| Water Heater Final | 9/5/2017 | 9/8/2017 | 9/8/2017 8:47:55 AM | A | FAIL |
|
|
customer is only available until 930AM -- please make first stop Phone #: ###-#### Inspection requested via web by Erin Whiting. 1. Write on the or a sticker showing the flue test preesure and duration you tested the flue and sign your name. 2. Pvc must be supported every 48". 3. Provide a 3" drip let after the shut-off and before the flex on the gas line. 4. Provide the installation/owners manual.
|