MEC97-02342
| INSP - Rough-in & Gas Pressure | 9/8/1997 | 9/9/1997 | 9/9/1997 12:00:00 AM | A | CANC |
|
|
09/09/97 407 - done 8/8/97 passed
|
BLD97-01802
| INSP - Framing/Rough-in | 9/8/1997 | 9/9/1997 | 9/9/1997 12:00:00 AM | A | FAIL |
|
|
09/09/97 407 - left corrections.
|
BLD97-02001
| INSP - Framing/Rough-in | 9/8/1997 | 9/9/1997 | 9/9/1997 12:00:00 AM | A | FAIL |
|
|
09/09/97 407 - left correction.
|
MEC97-02440
| INSP - Gas pressure test | 9/8/1997 | 9/9/1997 | 9/9/1997 12:00:00 AM | A | FAIL |
|
|
09/09/97 407 - Scheduled by Hello! on 09/08/97 at 17:09:49. left correction again.
|
BLD97-02436
| INSP - Footings | 9/9/1997 | 9/9/1997 | 9/9/1997 12:00:00 AM | P | PART |
|
|
poured before inspection no plans or persons on site.
|
BLD97-02587
| INSP - Energy code compliance | 9/9/1997 | 9/9/1997 | 9/9/1997 12:00:00 AM | P | PART |
|
|
09/09/97 407 - 2292 enter the insulation is ok but the mechanical has not been approved.
|
MEC97-02344
| INSP - Rough-in & Gas Pressure | 9/9/1997 | 9/9/1997 | 9/9/1997 12:00:00 AM | P | PASS |
|
|
|
MEC97-02410
| INSP - Gas log/ Fireplace | 9/10/1997 | 9/9/1997 | 9/9/1997 12:00:00 AM | P | PASS |
|
|
gas log fp.
|
MEC97-00556
| INSP - Final | 9/9/1997 | 9/9/1997 | 9/9/1997 12:00:00 AM | P | PASS |
|
|
Scheduled by Hello! on 09/09/97 at 09:18:59.
|
MEC97-00556
| INSP - Final | 9/9/1997 | 9/9/1997 | 9/9/1997 12:00:00 AM | P | PASS |
|
|
Scheduled by Hello! on 09/09/97 at 09:18:59.
|
BLD97-01092
| INSP - Framing/Rough-in | 9/9/1997 | 9/9/1997 | 9/9/1907 12:00:00 AM | P | CANC |
|
|
contractor was not ready,told me he would have his engineer check his hold-downs.
|