BLD98-03929
| Other | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | | FAIL |
|
|
ceiling grid... C/N
|
BLD1055940
| INSP - Conference | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | A | PASS |
|
|
W/ BRIAN MC MAHON : HAVE TENANT CALL FOR FINAL W/ INSPECTION FOR SUBSEQUENT PERMIT AS FINAL FOR THIS ONE IS REQ'D PRIOR
|
MEC99-02928
| Pressure Test | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | A | PASS |
|
|
not ready for final, pt. ok
|
MEC99-02712
| Final | 9/8/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | A | FAIL |
|
|
MIKE ###-#### PAGER, REINSPECTION.CHECK IN A TRAILER 54. 9/9 Called, unable to contact. jrb
|
MEC99-02928
| Final | 9/8/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | A | FAIL |
|
|
becky ###-####; 9/9 Needs pressure test, entered w/o. jrb
|
BLD98-01674
| INSP - Foundation | 9/8/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | A | PART |
|
|
MT/onsite, prelim soils report (test) ok. Keep c/n, need engr's clarification for sheer walls.
|
MEC99-02934
| Pressure Test | 9/8/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | A | PASS |
|
|
GAS TEST, PLEASE CALL 20 MIN PRIOR FOR LOCATION, EDDY ###-####. WEST SIDE OF BLD, ROOM, SOUTH OF KITCHEN; 9/9 entered pass. jrb
|
BLD99-01661
| INSP - Framing/Rough-in | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | PART |
|
|
c/n ok ceiling grid, etc.
|
BLD99-01785
| INSP - Foundation | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | PART |
|
|
strata onsite - fnd. wall
|
BLD99-01754
| INSP - Framing/Rough-in | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | PART |
|
|
begin roof frame ... spec. insp req'd
|
MEC99-02820
| Final | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | FAIL |
|
|
fail p.t.
|
BLD99-01785
| INSP - Foundation | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | PART |
|
|
ftg....
|
BLD99-02095
| INSP - Final | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | PASS |
|
|
Lot cleaned up - final
|
MEC99-02881
| Pressure Test | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | FAIL |
|
|
took for 337; 408 area...? c/n, recall p.t. & disable damper.
|
BLD99-02168
| INSP - Framing/Rough-in | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | FAIL |
|
|
c/n, ceiling grid, flammable vapor barrier, etc.
|
MEC99-02613
| Rough-in | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | PART |
|
|
c/n ok exc. combustion air...check at final...interlocking louvers.
|
BLD99-02547
| INSP - Final | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | PART |
|
|
looks ok, completed w/o insp.
|
BLD99-01836
| INSP - Framing/Rough-in | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | PART |
|
|
"SW1" ok ... ok to begin ext. gypsum
|
BLD99-02290
| INSP - Framing/Rough-in | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | FAIL |
|
|
JC ###-####; need plbg r/i
|
MIS99-00123
| INSP - Final | 9/9/1999 | 9/9/1999 | 9/9/1999 12:00:00 AM | P | PASS |
|
|
Carl, this is the one we talked about - house demo. - Final/Carl
|