Inspections for the day of: Thursday, September 9, 1999.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02073 INSP - Foundation9/7/19999/9/19999/10/1999 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 09/07/1999 at 16:55:16. Contact: ###-####. CANCELLED BY CONTRACTOR
BLD99-02073 INSP - Foundation9/9/19999/9/19999/9/1999 12:00:00 AM CANC
9/9 Needs PM inspection. jrb
BLD99-01630 INSP - Final9/8/19999/9/19999/9/1999 12:00:00 AMAFAIL
PAT ###-####; 9/9 OK for temp occ, C/N on site. jrb
MEC99-02929 Pressure Test9/8/19999/9/19999/9/1999 12:00:00 AMAPASS
SAVRINA ###-####, R/I GAS TEST; 9/9 entered pass. jrb
BLD99-02225 INSP - Framing/Rough-in9/8/19999/9/19999/9/1999 12:00:00 AMAPASS
DAVE ###-#### FRAMING; 9/9 New door framing. jrb
BLD99-02494 INSP - Foundation9/9/19999/9/19999/9/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/09/1999 at 07:00:47. Contact: ###-####. 9/9 entered pass. jrb
BLD99-01098 INSP - Foundation9/9/19999/9/19999/9/1999 12:00:00 AMPFAIL
BLD99-01994 INSP - Framing/Rough-in9/9/19999/9/19999/9/1999 12:00:00 AMPFAIL
reinspection matt ###-####
BLD99-01994 INSP - Energy code compliance9/9/19999/9/19999/9/1999 12:00:00 AMPPASS
MEC99-02941 Rough-in9/9/19999/9/19999/9/1999 12:00:00 AMPPASS
BLD99-02618 INSP - Foundation9/9/19999/9/19999/9/1999 12:00:00 AMPPASS
BLD99-02053 INSP - Framing/Rough-in9/9/19999/9/19999/9/1999 12:00:00 AMPPASS
.
BLD99-02073 INSP - Foundation9/9/19999/9/19999/9/1999 12:00:00 AMPPASS
all foundation complete now, except garage walls