Inspections for the day of: Monday, September 9, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-02005 Other9/6/20029/9/20029/9/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/06/2002 at 11:43:20. Contact: ###-####. ri conference, use sancross at dlb lavs, use 3x2 combo and santee for tub drain instead of the side inlet on its back , also went over the 2nd floor bath waste. 9/9/2002 10:22:48 AM
PLM02-02631 Final9/6/20029/9/20029/9/2002 12:00:00 AMANR
###-#### needs open front seat on the wc. 9/9/2002 10:54:11 AM
PLM02-02756 Water and/or Sewer9/6/20029/9/20029/9/2002 12:00:00 AMAPASS
jeff- ###-####
PLM02-02753 Other9/9/20029/9/20029/9/2002 12:00:00 AMAPART
conference on how to get vent away from windoe,, they can do it
PLM02-02782 Water and/or Sewer9/9/20029/9/20029/9/2002 12:00:00 AMPPASS
###-####
PLM02-02631 Final9/9/20029/9/20029/9/2002 12:00:00 AMPPASS
PLM02-02755 Plumbing Rough-in9/9/20029/9/20029/9/2002 12:00:00 AMPPASS
vent and water to new breakroom sink 9/9/2002 1:06:20 PM
PLM02-00906 Plumbing Rough-in9/9/20029/9/20029/9/2002 12:00:00 AMPFAIL
2nd floor bathroom leaky, leaky backgraded
PLM02-00935 Plumbing Rough-in9/7/20029/9/20029/9/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/07/2002 at 23:21:30. Contact: ###-####. below floor ok to cover 9/9/2002 5:02:41 PM
PLM02-02770 Water and/or Sewer9/9/20029/9/20029/9/2002 12:00:00 AMPPASS
john- ###-#### water line will have a mound by the meter to get 3' cover due to rock 9/9/2002 1:38:53 PM
PLM02-02759 Plumbing Rough-in9/9/20029/9/20029/9/2002 12:00:00 AMPNH
Scheduled by a contractor via Hello! on 09/09/2002 at 08:42:08. Contact: ###-####.
PLM02-02734 Sprinkler (Final)9/9/20029/9/20029/9/2002 12:00:00 AMPPASS
###-####