MEC02-02511
| Final | 9/6/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | A | PASS |
|
|
cell ###-####-greg
|
BLD02-02015
| BLD-Footing | 9/6/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | A | PASS |
|
|
###-#### -jerry ft
|
MEC02-02391
| Pressure Test | 9/6/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 14:19:14. Contact: ###-####.
|
MEC02-02472
| Pressure Test | 9/6/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | A | PASS |
|
|
james- ###-####
|
BLD02-00218
| BLD-Final | 9/9/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | A | FAIL |
|
|
c/n on site
|
BLD02-01361
| BLD-Framing/Rough-in | 9/6/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | P | PASS |
|
|
late pm if possible; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok to insulate 9/9/2002 3:51:45 PM
|
MEC02-02500
| Rough-in | 9/9/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC02-02500
| Pressure Test | 9/9/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | P | PASS |
|
|
###-#### flue has been inspected
|
BLD02-01151
| BLD-Final | 9/9/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | P | PASS |
|
|
noel- ###-#### re-roof
|
BLD01-03240
| BLD-Framing/Rough-in | 9/9/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | P | FAIL |
|
|
###-#### needs bracing in trusses needs to nail 2ply trusses fire block fire place strap top plates with short laps ok to insulate 9/10/2002 9:11:32 AM
|
BLD02-00692
| BLD-Footing | 9/9/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD02-01491
| BLD-Conference | 9/9/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | P | DONE |
|
|
for conf greg ###-#### homeowner or cell ###-####
|
BLD02-01671
| BLD-Final | 9/6/2002 | 9/9/2002 | 9/9/2002 12:00:00 AM | P | CANC |
|
|
neil; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|