Inspections for the day of: Thursday, September 9, 2004.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-01877 BLD-Foundation9/8/20049/9/20049/9/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 9/8/2004 at 7:40:27 AM. Contact: ###-####. footing no t formed or poured yet. 9/9/2004 11:57:06 AM
BLD04-01938 BLD-Concrete9/8/20049/9/20049/9/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/8/2004 at 1:09:27 PM. Contact: ###-####. Footing...stem and slab mono pour....OK. 9/9/2004 10:37:28 AM
BLD04-00317 BLD-Final9/8/20049/9/20049/9/2004 12:00:00 AMAPASS
colby; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD04-01626 BLD-Energy code compliance9/9/20049/9/20049/9/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 9/9/2004 at 7:13:59 AM. Contact: ###-####.
BLD04-01950 BLD-Foundation9/9/20049/9/20049/9/2004 12:00:00 AMPPASS
manuel; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD04-01925 BLD-Footing9/9/20049/9/20049/9/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 9/9/2004 at 10:37:22 AM. Contact: ###-####.
BLD04-01877 BLD-Footing9/9/20049/9/20049/9/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 9/9/2004 at 11:06:50 AM. Contact: ###-####. NR....still forming at West wall....cannot verify setback at West side. 9/9/2004 11:56:03 AM
BLD03-02892 BLD-Framing/Rough-in9/8/20049/9/20049/9/2004 12:00:00 AMPNR
peter; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Mistake......should have been Electr rough. 9/9/2004 1:39:44 PM
BLD04-01969 BLD-Footing9/8/20049/9/20049/9/2004 12:00:00 AMPPASS
after 1?? natalia; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie