Inspections for the day of: Thursday, September 9, 2004.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC04-01771 Final9/8/20049/9/20049/9/2004 12:00:00 AMANR
Scheduled by a contractor via Hello! on 9/8/2004 at 3:30:38 PM. Contact: ###-####. called martha 9/9/2004 9:31:23 AM
MEC04-02344 Final9/8/20049/9/20049/9/2004 12:00:00 AMAPASS
PLEASE CALL ROBERT FOR ACCESS...###-####
MEC04-01143 Final9/8/20049/9/20049/9/2004 12:00:00 AMAPASS
JENNIFER...###-####
MEC04-02366 Conference9/8/20049/9/20049/9/2004 12:00:00 AMAPASS
Please give me a call about 30 min before. Thanks; Phone #: ###-#### Internet Inspection Request from: Stacy Ware discussed horizontal oval vent in kitchen..stacey provided specs on ifgc allowing installation 9/10/2004 9:54:00 AM
MEC04-02230 Final9/9/20049/9/20049/9/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 9/9/2004 at 8:21:11 AM. Contact: ###-####. nobody home..left notice 9/9/2004 3:05:21 PM
MEC04-01771 Final9/9/20049/9/20049/9/2004 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 9/9/2004 at 9:31:45 AM. Contact: ###-####.
MEC04-02035 Final9/9/20049/9/20049/9/2004 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 9/9/2004 at 9:34:11 AM. Contact: ###-####....###-#### fred 9/9/2004 3:54:08 PM
MEC04-02270 Rough-in9/8/20049/9/20049/9/2004 12:00:00 AMPPART
for homeowner ###-####- chris ..off mcmillan to mitchell to skycrest 9/8/2004 3:00:52 PM need to check f/p before covering...need comb air...insulate all metal in garage and attic...shield flue..range vent...shut-off for f/p all of these by final 9/9/2004 2:15:25 PM
MEC04-02386 Final9/8/20049/9/20049/9/2004 12:00:00 AMPPASS
Pressure test only. Call with any problems. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS 20lb test ok 9/9/2004 1:17:11 PM