Inspections for the day of: Friday, September 9, 2005.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00198 INSP-Final Inspection9/8/20059/9/20059/13/2005 3:29:55 PMACANC
Contractor has rescheduled inspection for a later date.
FIR05-00527 INSP-Final Inspection9/8/20059/9/20059/9/2005 4:56:23 PMAPASS
Fire sprinkler passed inspection, verification is pending for approval of the flex heads as used throughout the space and not submitted for on the plans.
FIR05-00548 INSP-Final Inspection9/9/20059/9/20059/9/2005 4:31:07 PMPPASS
Fire sprinkler permit finaled.
FIR05-00248 INSP-Sprinkler Rough-in/Hydro9/7/20059/9/20059/9/2005 4:30:29 PMAPART
Hydrostatic test of the UG fire supply line passed inspection. Flushing of the UG supply performed after the hydro was also satisfactory.
BLD04-02867 FIRE-Final Inspection9/8/20059/9/20059/9/2005 3:36:54 PMAFAIL
No approved plans or city permit documents on site for review, noted the need for a fire extinguisher, exit signs and emergency lighting for the addition.
BLD05-01821 FIRE-Final Inspection9/8/20059/9/20059/9/2005 2:55:56 PMAPASS
Fire extinguisher has been installed as discussed. Fire life safety finaled.
FIR05-00516 INSP-Alarm Testing9/8/20059/9/20059/9/2005 2:54:56 PMAPASS
Fire alarm is satisfactory.
BLD05-01769 FIRE-Final Inspection9/8/20059/9/20059/9/2005 1:32:18 PMAPASS
Life safety is acceptable.
FIR05-00377 INSP-Final Inspection9/8/20059/9/20059/9/2005 12:32:35 PMAPASS
Cd rating on one strobe which did not match plan was adjusted while on site, fire alarm permit finaled.
FIR05-00440 INSP-Final Inspection9/8/20059/9/20059/9/2005 12:29:21 PMAPASS
Relocated strobe is satisfactory, fire alarm finaled.
FIR05-00490 INSP-Final Inspection9/8/20059/9/20059/9/2005 12:27:54 PMAPASS
Fire alarm passed inspection.
FIR05-00259 INSP-Sprinkler Rough-in9/7/20059/9/20059/9/2005 12:24:35 PMACANC
No time for this inspection today, spoke with Mike from TV to schedule for monday 9/12 per our agreement.
FIR05-00502 INSP-Final Inspection9/9/20059/9/20059/9/2005 12:22:28 PMPPASS
Hood system reported to the FACP, AIM functioned properly, fire alarm permit finaled.
BLD05-01181 FIRE-Final Inspection9/8/20059/9/20059/9/2005 12:09:42 PMAPASS
One exit sign without battery backup was repaired while on site. Fire life safety finaled.
FIR05-00484 INSP-Final Inspection9/8/20059/9/20059/9/2005 12:07:20 PMAPASS
Hood supression system operated correctly under test conditions.
FIR05-00511 INSP-Final Inspection9/8/20059/9/20059/9/2005 12:05:48 PMAPASS
Overhead fire sprinkler passed inspection, noted to contractor that 200 degree heads are recommended in freezers.
FIR03-00742 INSP-Final Inspection9/8/20059/9/20059/9/2005 12:02:16 PMACANC
No time for this inspection today, spoke with Kent the GC to schedule for monday 9/12 per our conversation.
FIR05-00547 INSP-Final Inspection9/9/20059/9/20059/9/2005 12:00:00 AMPPASS
Fire sprinkler finaled.
BLD05-01316 FIRE-Final Inspection9/9/20059/9/20059/9/2005 12:00:00 AMPPASS
Fire ext. has been installed. Fire life safety finaled.