PLM08-02185
| Plumbing Rough-in | 9/9/2008 | 9/9/2008 | 9/9/2008 2:54:56 PM | P | PASS |
|
|
David Phone #: ###-#### ri ok
|
PLM08-00046
| Final | 9/8/2008 | 9/9/2008 | 9/9/2008 2:32:16 PM | P | PASS |
|
|
Finally we get to call for a final on this project. Should be ready any time after 1:00 P.M. Phone #: ###-#### Internet Inspection Request from: Randy Calkins final ok with floor drains by the water heaters exposed.
|
PLM08-00587
| Final | 9/9/2008 | 9/9/2008 | 9/9/2008 2:03:10 PM | P | PASS |
|
|
Mike Phone #: ###-#### final ok
|
PLM08-01936
| Final | 9/8/2008 | 9/9/2008 | 9/9/2008 1:38:38 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 9/8/2008 at 9:45:02 PM. Contact: ###-####.
|
PLM08-02171
| Sprinkler (Final) | 9/8/2008 | 9/9/2008 | 9/9/2008 1:22:34 PM | P | PASS |
|
|
Dan ###-####
|
PLM08-02176
| Water and/or Sewer | 9/9/2008 | 9/9/2008 | 9/9/2008 10:09:39 AM | A | FAIL |
|
|
existing sewer is located in the new crawl space. I extended the sewer to the basement, left a stub up in the crawl and continued it outside the foundation to allow for building sewer cleanout. Kinda different but I didn''t see any other way to do it. Phone #: ###-#### Internet Inspection Request from: Josh Roper need to replace the existing AC sewer under the new house with approved material.
|
PLM08-01487
| PLM-Aging Inspection | 9/9/2008 | 9/9/2008 | 9/9/2008 9:21:50 AM | | NR |
|
|
no roof yet
|
PLM08-01805
| Sprinkler (Final) | 9/8/2008 | 9/9/2008 | 9/9/2008 9:14:55 AM | A | PASS |
|
|
arron Phone #: ###-#### - please call 1/2 hr prior 160 psi min poly upstream of bfp. shutoff and drain valves required. rp below grade prohibited use dcva. two clamps required at each joint in poly. have dcva certified.
|
PLM08-02153
| Water and/or Sewer | 9/5/2008 | 9/9/2008 | 9/9/2008 8:41:17 AM | A | FAIL |
|
|
Please call Joe with any questions Phone #: ###-#### Internet Inspection Request from: Nichole Collingwood needs unions
|
PLM08-02152
| Final | 9/8/2008 | 9/9/2008 | 9/8/2008 1:36:33 PM | A | PASS |
|
|
alex Phone #: ###-####
|