Inspections for the day of: Tuesday, September 9, 2008.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-02470 Final9/8/20089/9/20089/9/2008 4:07:05 PMPPASS
Final inspection for pool pump wiring.
Please when your on your way - george ###-#### - homeowner needs 20min to get to site.
thank you !! Town and Country Electric - ###-#### Phone #: ###-#### Internet Inspection Request from: Carla Ward ok to final, no esc this project
ESC08-00191 General Inspection9/9/20089/9/20089/9/2008 3:34:57 PMPPART
looked ok
ESC08-00084 Site Preparation9/9/20089/9/20089/9/2008 3:34:11 PMPPART
looked ok
ESC08-00262 General Inspection9/9/20089/9/20089/9/2008 3:31:34 PMAPART
looked ok
ELE08-01563 Electrical Rough-In9/9/20089/9/20089/9/2008 3:30:33 PMPPART
jason Phone #: ###-#### ok to cover walls only anop
ELE08-02073 Conference9/8/20089/9/20089/9/2008 3:29:41 PMADONE
terrance - around 12:00 Phone #: ###-#### talked about sewer lift and where to get power for equipment, will need to see manufacturers instructions,said a ri inspection would be necessary before cover any u/g, no esc this project
ELE08-01064 Final9/9/20089/9/20089/9/2008 2:37:30 PMPFAIL
Neil Phone #: ###-#### called, left correction notice, NEC 210.11(C)(3) bathroom 20amp branch circuit shall not supply other outlets (a/c), 352.30(A) pvc shall be securely fastened within 3' of termination, 250.32(A) structure supplied by feeder shall have grounding electrode system installed,314.21 shall repair drywall for closet lights, BCC shall install fluorescent tubes, shall install under-counter lights
ELE08-02472 Final9/9/20089/9/20089/9/2008 1:50:59 PMPPASS
ok to final, no esc this project
ELE08-02472 Electrical Rough-In9/9/20089/9/20089/9/2008 1:12:56 PMPPASS
Added floor outlet, this is also a final. Any questions please call Clay ###-####. Phone #: ###-#### Internet Inspection Request from: Clay Morgan ric ok, no esc this project
ELE08-02489 Permanent Service9/9/20089/9/20089/9/2008 12:26:14 PMPPASS
Gary dryer and range are gas bonding and main ground are in crawl space with in 3 ft of water coming in Phone #: ###-#### called contractor, p/s o/h rec ok, no esc this project
ELE08-01696 Final9/8/20089/9/20089/9/2008 9:53:22 AMAPASS
Meet Boise Parks & Rec on-site Phone #: ###-#### Internet Inspection Request from: Kristopher Wilson met with 324, unit is ok per State, ok to final
ELE08-02140 Rough-In Permanent Service9/8/20089/9/20089/9/2008 9:09:54 AMAPASS
RON Phone #: ###-#### ric ok, p/s u/g n ok
ELE07-03307 Conference9/8/20089/9/20089/9/2008 8:33:32 AMADONE
CONTACT: PHIL BASSICK Phone #: ###-#### Internet Inspection Request from: Deb Gooden reviewed plans, talked with contractor, ok to use 1 meter per sub-panel per space for residences, main service is delivered at main point by ipco
ELE08-01848 Electrical Rough-In9/8/20089/9/20089/9/2008 8:21:46 AMAPASS
Cieling inspection for Gap Body, please call Luke @ ###-#### if you have any questions. Phone #: ###-#### Internet Inspection Request from: Beka Hereau ok to cover gap body ceiling only, no esc this project