ESC09-00404
| Site Preparation | 9/3/2009 | 9/3/2009 | | | |
|
|
|
BLD09-01445
| BLD-Framing/Rough-in | 9/8/2009 | 9/9/2009 | 9/9/2009 5:30:18 PM | P | NR |
|
|
robert Phone #: ###-#### Need Electr R/I Prior to frame insp...........Left note.
|
MIS09-00120
| BLD-Final | 9/9/2009 | 9/9/2009 | 9/9/2009 5:29:07 PM | P | CANC |
|
|
|
BLD09-00254
| BLD-Framing/Rough-in | 9/9/2009 | 9/9/2009 | 9/9/2009 3:23:52 PM | P | FAIL |
|
|
smith Phone #: ###-#### Need Fireblocking and sealing of penitrations thru top plates..... Concrete and CMU OK pending STRATA special insp and approvals
|
BLD09-00253
| BLD-Framing/Rough-in | 9/9/2009 | 9/9/2009 | 9/9/2009 3:20:50 PM | P | NR |
|
|
smith Phone #: ###-#### Need Electr R/I............Firebblocking.......Talked to Contr about Special insp Concrete and CMU. OK pending STRATA tests and approvals.
|
BLD09-01191
| BLD-Framing/Rough-in | 9/8/2009 | 9/9/2009 | 9/9/2009 1:21:03 PM | A | PASS |
|
|
Mark Phone #: ###-####
|
BLD09-00859
| BLD-Energy code compliance | 9/8/2009 | 9/9/2009 | 9/9/2009 1:20:22 PM | A | PASS |
|
|
delbert Phone #: ###-####
|