Inspections for the day of: Wednesday, September 9, 2009.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Strole
TitlePLM/MEC-INSPECTOR
Phone #794-7913
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM09-01500 Plumbing Rough-in9/9/20099/9/20099/9/2009 4:02:56 PMPPASS
Scheduled by a contractor via Hello! on 9/9/2009 at 8:43:46 AM. Contact: ###-####.
PLM09-01376 Plumbing Rough-in9/9/20099/9/20099/9/2009 3:40:19 PMPPASS
ESC09-00492 BMP Violation9/8/20099/9/20099/9/2009 3:22:53 PMPPASS
PLM08-02479 Water and/or Sewer9/9/20099/9/20099/9/2009 3:11:53 PMPFAIL
24 hr test on interceptor fail at truck wash.
PLM09-00758 Water and/or Sewer9/8/20099/9/20099/9/2009 3:10:44 PMPCANC
test on interceptor fail, interceptor supplied & installed by knife river. change inspection to plm08-02479.
PLM09-01430 Sprinkler (Final)9/8/20099/9/20099/9/2009 2:20:49 PMPPASS
ESC09-00429 BMP Violation9/8/20099/9/20099/9/2009 1:58:04 PMPFAIL
left verbal & written correction with rp to provide a concrete washout, clean up all concrete that was washed out by street and on site and put in concrete washout & clean up all dirt & debris off all hard surfaces. have complete by days end or a stop work will be issued. will reinspect 9-10-09 am.
ESC09-00426 BMP Violation9/8/20099/9/20099/9/2009 1:57:43 PMPFAIL
left verbal & written correction with rp to provide a concrete washout, clean up all concrete that was washed out by street and on site and put in concrete washout & clean up all dirt & debris off all hard surfaces. have complete by days end or a stop work will be issued. will reinspect 9-10-09 am.
ESC09-00428 BMP Violation9/8/20099/9/20099/9/2009 1:57:07 PMPFAIL
left verbal & written correction with rp to provide a concrete washout, clean up all concrete that was washed out by street and on site and put in concrete washout & clean up all dirt & debris off all hard surfaces. have complete by days end or a stop work will be issued. will reinspect 9-10-09 am.
PLM09-01362 Final9/8/20099/9/20099/9/2009 1:23:09 PMAPASS
ESC09-00193 Site Final9/9/20099/9/20099/9/2009 9:55:14 AMAPASS
PLM09-00745 Final9/8/20099/9/20099/9/2009 9:54:57 AMAPASS
ESC08-00457 Tracking Control9/9/20099/9/20099/9/2009 9:47:20 AMAFAIL
left verbal correction with rp to maintain construction entrance & di on overland & clean up tracking & need a concrete washout pit by days end.
PLM09-01376 Plumbing Rough-in9/8/20099/9/20099/9/2009 9:07:37 AMAPART
mait Phone #: ###-####-need to fix reverse grade on traparm for lav.
ESC09-00523 General Inspection9/4/20099/9/20099/9/2009 8:42:32 AMAPASS
ESC09-00468 General Inspection9/4/20099/9/20099/9/2009 8:42:15 AMAPASS
ESC09-00467 General Inspection9/4/20099/9/20099/9/2009 8:41:58 AMAPASS
PLM09-01481 Plumbing Rough-in9/8/20099/9/20099/8/2009 2:43:26 PMPCANC