Inspections for the day of: Thursday, September 9, 2010.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00352 General Inspection9/9/20109/9/20109/9/2010 2:03:27 PMPPART
Overall things are in compliance, prior to removing ashpalt on north side, sediment barriers are needed until the site is stablized. Will meet with owners on Friday, 9/10 to review final stabilzation measures.
ESC10-00642 Site Preparation9/8/20109/9/20109/9/2010 1:36:13 PMAPASS
Reviewed site with RP; Soil vapor borings & installation of soil probes are minor and no problems observed.
ESC10-00531 Site Preparation9/9/20109/9/20109/9/2010 12:00:00 AMAFAIL
ESC controls not in place and major grading is taking place. Inspection was performed by Inspector 420 late afternoon of 9/8/10. Gave contractor until the end of the day of 9/910 to achieve compliance to the approved plan including posting signage, etc. of a Stop Work Order will be issued. Follow up inspection will take place Friday morning, 9/10/10.