ESC10-00450
| BMP Violation | 9/8/2010 | 9/9/2010 | 9/9/2010 2:36:17 PM | A | PART |
|
|
Verbal to RP: Maintain all sediment barries along the driveway. Also correct any rills that have formed along the driveway.
|
ESC09-00507
| General Inspection ESC | 9/9/2010 | 9/9/2010 | 9/9/2010 2:36:16 PM | | PART |
|
|
Verbal to RP: Maintain sediment barrier along the driveway. Also repair any rills that have formed on the driveway. Will allow correction to occur upon there next inspection.
|
ESC10-00374
| Site Preparation | 9/9/2010 | 9/9/2010 | 9/9/2010 11:08:55 AM | A | FAIL |
|
|
Message to RP: UInstall a asediment barrier back of sidewalk infornt of building. Also install a storm drian inlet protection on the storm drain to the west of project. Will re-inspect on 9/10/10PM
|
ESC10-00283
| General Inspection | 9/7/2010 | 9/9/2010 | 9/9/2010 8:30:32 AM | A | FAIL |
|
|
Verbal to RP: Re-install sediment barrier along Vista per manufacture specifications. Also add additional sediment barrier along Vista due slope and elevation of grade. Will reinspect on 9/10/10am.
|
ESC10-00616
| Site Preparation | 9/9/2010 | 9/9/2010 | 9/9/2010 8:30:31 AM | P | PASS |
|
|
All BMP's inplace and project is contained.
|