BLD13-01395
| FIRE-Final Inspection | 9/9/2013 | 9/9/2013 | 9/9/2013 4:38:54 PM | P | CANC |
|
|
Suppression system not done.
|
FIR13-00477
| INSP-Final Inspection | 9/9/2013 | 9/9/2013 | 9/9/2013 4:31:45 PM | P | FAIL |
|
|
Hood fan and make air not working.
|
FIR13-00338
| INSP-Sprinkler Rough-in | 9/6/2013 | 9/9/2013 | 9/9/2013 3:13:14 PM | A | FAIL |
|
|
Tenting of pipe pass o sprinkler head on 1st floor West unit W bedroom still to far off wall.
|
BLD13-02474
| FIRE-Final Inspection | 9/9/2013 | 9/9/2013 | 9/9/2013 3:01:01 PM | P | FAIL |
|
|
o Celling tiles need to be replaced. o Extinguishers out of date and an additional extingusher needs added in main entry. o Door to garage (1hr seperation) needs door stop removed and adjusted for closure. o Door from back area to office area currently locks so their is only one way of travel, may need to be unlocked. o exit light in SW corner out. o Exit light on main door battery out.
|
FIR13-00471
| INSP-Final Inspection | 9/9/2013 | 9/9/2013 | 9/9/2013 12:11:30 PM | P | PASS |
|
|
Duct detector tested and passed
|
BLD13-02474
| FIRE-Final Inspection | 9/9/2013 | 9/9/2013 | 9/9/2013 10:53:12 AM | P | CANC |
|
|
Brenda Phone #: ###-#### Inspector will be there at 14:30 CDH
|
FIR13-00477
| INSP-Final Inspection | 9/6/2013 | 9/9/2013 | 9/9/2013 10:39:47 AM | A | NR |
|
|
Dave ###-#### Won't be ready until afternoon. CDH 10:39
|
BLD13-00007
| FIRE-Final Inspection | 9/6/2013 | 9/9/2013 | 9/9/2013 10:08:18 AM | A | PASS |
|
|
No corrections
|
FIR13-00462
| INSP-Final Inspection | 9/9/2013 | 9/9/2013 | 9/9/2013 10:05:23 AM | P | CANC |
|
|
Cole Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
|
FIR12-00698
| INSP-Alarm Testing | 9/6/2013 | 9/9/2013 | 9/9/2013 10:04:08 AM | A | DONE |
|
|
Phase 2A; All systems tested and pass for this phase. Initiating devices + 4 pull stations and 1 duct detector.
|