Inspections for the day of: Monday, September 9, 2013.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-01421 BLD-Wall Bracing9/9/20139/9/20139/9/2013 4:23:38 PMPPASS
Brandon Phone #: ###-####
BLD13-02249 BLD-Framing/Rough-in9/9/20139/9/20139/9/2013 4:06:29 PMPPASS
Mike-Shear inspection please Phone #: ###-####
BLD13-01314 BLD-Final9/9/20139/9/20139/9/2013 3:42:02 PMPPASS
adam Phone #: ###-####
BLD13-01314 DOC - Permit Finaled9/9/20139/9/20139/9/2013 3:41:59 PMPPASS
BLD13-02079 BLD-Footing9/9/20139/9/20139/9/2013 3:31:03 PMPPASS
Anton Phone #: ###-####
BLD12-02721 BLD-Energy code compliance9/9/20139/9/20139/9/2013 3:04:15 PMPNR
bob Phone #: ###-#### for all 3 units
BLD12-03233 BLD-Framing/Rough-in9/9/20139/9/20139/9/2013 2:47:43 PMPPASS
Ceiling grid inspection please-Dale Phone #: ###-####
BLD13-01975 BLD-Final9/5/20139/9/20139/9/2013 2:47:01 PMPPASS
Bill-Please call prior to inspection Phone #: ###-####
BLD13-01975 DOC - Permit Finaled9/9/20139/9/20139/9/2013 2:46:46 PMPPASS
BLD13-01335 BLD-Conference9/5/20139/9/20139/9/2013 1:31:52 PMADONE
Barb @ permit desk before you go out please call me for info Phone #: ###-#### no tennet
BLD13-01335 DOC - Permit Expired9/9/20139/9/20139/9/2013 1:31:30 PMPPASS
Barb @ permit desk before you go out please call me for info Phone #: ###-#### no tennet
BLD12-01001 BLD-Framing/Rough-in9/9/20139/9/20139/9/2013 1:05:25 PMPPART
steve Phone #: ###-#### roof nailling ok to cover// engineer of record to do on site review of roof at wesy stair for strucral design and how to load with respect to concrete.
ESC13-00675 Site Preparation9/6/20139/9/20139/9/2013 11:32:45 AMANR
kristi Phone #: ###-####
BLD13-01926 BLD-Foundation9/6/20139/9/20139/9/2013 11:02:19 AMAPASS
ryan Phone #: ###-####
BLD13-01675 BLD-Footing9/6/20139/9/20139/9/2013 9:10:19 AMAPASS
rick Phone #: ###-####